Asbestos cleanup scope letter, 65 Nassau Street, Sep 2001

Machine-extracted title · confidence 100%

Letter outlining the scope of work for asbestos debris cleanup at 65 Nassau Street following the WTC collapse.

NYC-WTC_000098004–000098011

Folder label: “65 NASSAU STREET 4001108, 65/7501

Page image
Scanned page image, NYC-WTC_000098010
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ENVIRONMENTAL CONTROL BOARD NOTICE OF VIOLATION VIOLATION NO.50033479 CITY OF NEW YORK AND HEARING r c~ YOU A~REQUI AND ARE HEREBY DIRECTED, TO APPEAR FOR A HEARING ON® ®'at 4 m at the Environmental Control Board, 1250 Broadway, New York, NY 10001, 7th Floor;

This hearing is your opportunity to answer and defend the allegations set forth below. IF YOU DO NOT APPEAR, YOU WILL BE HELD IN DEFAULT AND SUBJECT TO MAXIMUM PENALTIES. READ THE INSTRUCTIONS ATTACHED.

Premise: S 5A Commissioner of the Department of Environmental Protection of the City of New York, Petitioner, V. Borough: 'A l- c J i r A9°J lASY'.\ ()VJ-r4's ` V, Respondent

VJ ' '' ST Street Address of Respondent

\ lI k j 0 () 0' City, State, Zip Code Capacity of Respondent: ❑ Contractor Building Owner ❑ Other

Upon Investigation, Petitioner has determined that there is reasonable cause to believe that Respondent has violated the following subsections of

Title 24, Chapter 1, New York City Administrative Code (Air Pollution Control Code)

Title 15, Chapter 1, Rules of the City of New York ❑ Section 1-25(c) Failed to file Asbestos Inspection Report (Form ACP-7) with DEP one week in advance of the start of the work. ❑ Section 1-51(a) Employed uncertified workers ( ) on an asbestos project. ❑ Section 1-51(c) Failed to provide and/or ensure the wearing of protective clothing ( ) by all individuals engaged in abatement activities. ❑ Section 1-51(g) Failed to post asbestos warning signs. ❑ Section 1-81(i) Failed to seal fixed objects with at least one layer 6-mil plastic sheeting. ❑ Section 1-81(m) Failed to seal floor and wall surfaces with at least two layers 6-mil plastic sheeting. 0 Section 1-91(a) Failed to utilize negative pressure equipment. ❑ Section 1-102(a)Failed to abate ACM by wet methods. ❑ Section 1-102(f) Failed to remove all visible residue from surfaces from which ACM has been removed. ❑ Section 1-112(f) Failed to verity the absence of visible ACM prior to commencement of clearance air monitoring. Other: L 1 4o t

I _ '~ ~. L rv~Pr S . =~ J (2)

(3)

(4)

❑ SECOND OFFENSE (LIST SUBSECTIONS):

The above violation occurred or was observed or was determined to exist base on a review of departmental records, on or about

on the day of f ~~

C f c- Inspector's gnat a/Badge Number 0 2._13 a.m.(M

If such violation be proven or admitted, Respondent may be subject to civil penalties for each subsection of the violation in amounts according to the schedule set forth on the reverse ide of this form for each day during which such violation continues.

ACP NYC-WTC 000098010

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000098010Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →