NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 33/65 NASSAU STREET 4001108, 65/7501
Document / 8 pages

Asbestos cleanup scope letter, 65 Nassau Street, Sep 2001

Machine-extracted title · confidence 100%

Letter outlining the scope of work for asbestos debris cleanup at 65 Nassau Street following the WTC collapse.

NYC-WTC_000098004–000098011

Folder label: “65 NASSAU STREET 4001108, 65/7501

Page image
Scanned page image, NYC-WTC_000098009
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT PAGE 1 OF PREMISE ADDRESS INSPECTION DATE 65 NASSAU STREET 12 -05 - 01

FLOOR ZIP BORO CODE BLOCK LOT SQUAD BADGE # ALL FLOORS 10001 1 65 1 1 A066

INSPECTOR BLDGTYPE BASIS OF INSPECTION PHOTOS TAKEN MICHAEL DAVIS A 386332 NO

CONTRACTORS NAME: SAMPLE NO. BLACK ROCK CONSTRUCTION COMPANY ADDRESS CITY SAMPLE NO. 88-15 168TH STREET JAMAICA STATE ZIP PHONE SAMPLE NO. NY 11432 718-297-8391 3RD PARTY AIR MONITOR NAME: OWNERS NAME CENTRAL ENVIRONMENTAL, INC. 65 NASSAU OWNER'S CORPORATION ADDRESS CITY ADDRESS CITY 91 McCLELLAN STREET BRONX 65 NASSAU STREET NY

STATE ZIP PHONE STATE ZIP PHONE NY 10452 718-293-8727 NY 10001

CONTACT PERSON TIME OF INSPECTION FROM: 2:05 PM - 2:45 PM KANHAI DALLEY, ASBESTOS SUPERVISOR

INSPECTION DISCLOSED:

When I arrived at the above address I noted workers wiping the walls of the lobby level. There was a schedule of asbestos cleanings posted on the lobby door, but there were no asabestos warning signs posted. I asked to see the Building Superintendant. He was not present. The asbestos handler superviver came out and took my through the lobby area and up a flight of stairs where I noted on the next level workers in PPE wiping the walls. There was also a microtrap in operation.

The supervisor then explained that he had been asked to "cover" the work site for a friend. He had no other information about the project. I asked for the ACP7 notice. He did not have it.

Upon my return to the office, I learned that the asbestos abatement contractor had attempted to file an emergency ACP7 notice (TRU1460MN01) for the project within an hour of the completeion of my inspection. The proposal was not deemed acceptable. The contractor had wanted to to submit a clean up protocol initially dated October 16, 2001 which had it's dtae amended by hand to conform to the date of my inspection. A later filing dated December 11, 2001 was subsequently accepted.

Violations will be issued.

NOV # INFRACTIONS RESULT CODE 50033479N §1-26(b) 1 SUPERVISOR'S INMALS NOV # INFRACTIONS 50033480K §1-51(g) Cc

BORO 1= MANHATTAN 2 = BRONX 3 = BROOKLYN 4 = QUEENS 5 = STATEN ISLAND

BLDG. TYPE A> 6 STORIES B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY

RESULT CODES 1= Violation Issued 2 = No Violation Issued 3 = No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

NYC-WTC 000098009

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000098009Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →