NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 33/125 Cedar
Document / 4 pages

Permit application for asbestos abatement, 125 Cedar Street

Machine-extracted title · confidence 90%

Application for a permit to perform interior cleaning and asbestos abatement at 125 Cedar Street.

NYC-WTC_000097106–000097109

Folder label: “125 Cedar

Page image
Scanned page image, NYC-WTC_000097109
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

' Cleaning Procedures For 125 Cedar Street

water extraction cleaner after consultation with and approval by tenant/owner as applicable. Water extraction cleaning shall not be conducted if it would cause damage.

g) Books, record albums, videotapes, paperwork, and documents shall be removed and disposed unless identified for cleaning. A HEPA vacuum with a soft brush attachment shall be used for cleaning these items.

(17) All equipment used for cleaning activities shall be vacuumed and/or wet wiped prior to removal from the work area.

(18) The project monitor shall perform a thorough visual inspection to verify the absence of visual dust accumulations. Additional clean-up procedures shall be performed where visible dust is observed.

(19) Upon successful visual inspection, the work area shall be isolated from the remainder of the work site pending clearance air monitoring. Clearance air monitoring shall be performed after completion of all clean up activities at the work site.

(20) The Air Sampling Technician shall perform air sampling after the area is free of dust accumulations as determined by the Project Monitor. The apartment will be re-cleaned and retested if the air monitoring clearance criteria are not achieved. The clearance air monitoring criteria have been established by the USEPA for this clean up activity (WTC vicinity). Refer to the monitoring specification for this information.

(21) After successful clearance air monitoring, isolation barriers shall be removed in accordance with the applicable requirements of Title 15, Chapter 1 of the RCNY and New York State Industrial Code Rule 56.

(22) The cleaning contractor is not responsible for damage or loss caused by the acts of parties not involved with the cleanup. Tenant shall be responsible for the removal of any valuables. If such removal is not feasible, the tenant shall notify the Project Monitor in writing (including original receipt, formal appraisal, or estimated value) as to the location, description and value of said item.

(23) Disposal of all waste generated during the cleaning shall be the responsibility of the contractor. All waste generated shall be treated as asbestos-containing material (ACM) unless otherwise indicated herein. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

(24) All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the RCNY and New York State Industrial code Rule 56.

(25) Visual mold has been verified in apartments 6N, 5N, 4N, 3N and 2N. The contractor shall cut and remove all portions of sheet rock with the presence of mold. The abatement contractor shall not be responsible for repair or replacement of removed sheet rock. For other surfaces, the cleaning contractor shall perform necessary remediation with additional guidance from

4 of 6

NYC-WTC 000097109

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000097109Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →