Cleaning Procedures
For
125 Cedar Street
is not responsible for the reinstallation of said items or any damage related to the removal of
built-in items.
c) Kitchen stoves and refrigerators shall be wet wiped and HEPA vacuumed. After the cleaning
procedures, the project monitor shall evaluate the stoves to determine proper disposal
methodology.
(15) The project monitor shall perform a thorough visual inspection to verify the absence of visual dust
accumulations. Additional clean-up procedures shall be performed where visible dust is observed.
(16) Upon successful visual inspection, the work area shall be isolated fi-om the remainder of the work site
pending clearance air monitoring. Clearance air monitoring shall be performed after completion of all
clean up activities at the work site.
(17) The Air Sampling Technician shall perform air sampling after the area is free of dust accumulations as
determined by the Project Monitor. The apartment will be re-cleaned and retested if the air monitoring
clearance criteria are not achieved. The clearance air monitoring criteria are currently being finalized by
the USEPA.
(18) After successful clearance air monitoring, isolation barriers shall be removed in accordance with the
applicable requirements of Title 15, Chapter 1 of the RCNY and New York State Industrial Code Rule
56.
(19) The cleaning contractor is not responsible for damage or loss caused by the acts of parties not involved
with the cleanup. Tenant shall be responsible for the removal of any valuables. If such removal is not
feasible, the tenant shall notify the Project Monitor in writing (including original receipt, formal
appraisal, or estimated value) as to the location, description and value of said item.
(20) Disposal of all wastes generated during the cleaning shall be the responsibility of the contractor. All
waste generated shall be treated as asbestos-containing material (ACM). Transportation and disposal of
generated waste shall be in compliance with all applicable rules and regulations.
(21)- All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the
RCNY and New York State Industrial code Rule 56.
(22) Visual mold has been verified in apartments 6N, 5N, 4N, 3N and 2N. The contractor shall cut and remove
all portions of sheet rock with the presence of mold. The abatement contractor shall not be responsible for
repair or replacement of removed sheet rock. For other surfaces, the cleaning contractor shall perform
necessary remediation with additional guidance from NYCDEP and NYCDOH. Staff experienced in
mold remediation is required. The contractor may subcontract this portion of the work.
(23) Based on the site investigatio^he following table represents unit specific recommendations for cleaning
and/or disposal of items:
(24) Time sheets shall be submitted to DEP on a weekly basis.