NYC 9/11 Public Portal Document
JUL- ,51- cUl. d 1d; t.J P.03/08
Cillh~zlrflt .U3 &Cvd':r1.Cler) s,t.
Kathy Callahan
July 31, 2002
Page 2
Mr. Gilsenan reported and you confirmed that the PEP will
be hiring contractors certified by the City and State for a
full asbestos abatement, the rules and regulations for which
are on the DEP website. Mr. Gilsenan also reported that DEP
will be hiring a consultant to develop a specific scope for
cleaning the interior of 125 Cedar, which will then be meshed
with DEP's generic scope for asbestos abatement. You
confirmed that the EPA will review the scope and the tenants
will have an opportunity to review it before work is
comraenced. Both you and Mr. Gilsenan confirmed that this
consultant would be hired by the week following the July 4::
holiday. Las: weak, Mr. Gilsenan advised us that a draft of
the scope had been completed and forwarded to the EPA for its
review, it is our understanding that the draft scope will
then be forwarded to us for our review. Please advise us when
the EPA review will be completed and when we can expect to
receive it. It is cur understanding that it is still the
intention to begin the interior cleaning in approximately mid-
August.
You advised us that the EPA is the lead agency in
disaster response for overall indoor air cleanup post 9-11.
.ou assured us that the EPA will oversee the 125 Cedar cleanup
and that you will provide a written confirmation outlining Bob
Fitzpatrick's role in monitoring the process. We still have
not received that.
Mr. Gilsenan scheduled an initial walk-through of the
apartments by PEP and the tenants for July 1 and 2 to see what
items needed to be cleaned or disposed of. Mr. Gilsenan
advised us and you confirmed that this would not be a scope
development walk-through but the first step to give tenants an
opportunity to talk with the DEP individually about their
apartments. You emphasized that this was only a first step
and that it was optional for the tenants to participate in
this initial walk-through. You also assured us that if any
tenants were not available for this walk-through, there will
be other opportunities. it later turned out that DEP was
planning to develop the scope without conducting a further
walk-through. When the tenants objected, since many had not
been present for the initial walk-through, a further walk-
through was scheduled for August 1, 2 and 3, at which
NYC-WTC 000097085