NYC 9/11 Public Portal Document
Environmental Site Characterization — Facade Report
Fiterman Hall — 30 West Broadway, New York, NY
Airtek project 05-0867 — January 10, 2006
3.0 CHARACTERIZATION FINDINGS
3.1 Documentation Review
Reviews of existing documentation and drawings indicate that the building facade is
composed of an exterior brink and masonry fascia that is backed by structural steel and
block. The interstitial space between the brick fascia and the steel and block structural
backing was filled with sluiced mortar during construction. This detail was confirmed by
destructive testing of the interior of the facade.
Communicating openings are limited to entry doors and the loading dock of the ground
floor, operable windows on all floors, doors to setback roofs, and mechanical system
louvers and vents. Pipe Chases do exist in the facade, but these chases are accessible for
cleaning from the interior of the building.
3.2 Interviews — Historical Research
Interviews with facility operations and management personnel familiar with the history of
the Building indicate that the entire ribbon window system that rings every floor of the
Building was replaced in its entirety in the mid 1990s. Close visual inspection of the
condition of the window system supports this assertion. Both masonry opening caulk
(rubberized) and glazing material (rubberized) are intact. Interviews with NYC DEP
personnel familiar with the NYC DEP Facade Cleaning Program reveal that the Fiterman
Hall facade, with the exception of the gash area, was cleaned by a NYS DOL certified
asbestos contractor. As noted below, close visual inspection and laboratory testing
confirms this assertion. Bulk debris from the collapsed WTC 7 was removed from the
gash area of the Building by the NYC DDC during the WTC response of 2001-2002.
3.3 Facade Visual Inspection
A close visual inspection was conducted floor-by-floor by Airtek inspectors. The
inspection focused on determining if WTC debris remained on the facade after the
building had been cleaned by the NYC DEP, and on the structural integrity of the facade
and window system as a potential component of the barrier system to be used to contain
contaminants during the abatement of asbestos and CoPCs from the building.
Debris:
The visual inspection revealed no remaining debris on the facade of the upper
floors of the building, and very little debris on the facade of the lower floors.
Isolated locations where debris remains have been identified for focused cleaning
as a part of the abate, ent phase of the project. These locations include the Gash
Area, specified areas of the second floor, and the entire first floor facade. Most
areas of the second floor and first floor facade do not exhibit WTC-type debris,
but exhibit build-up of background urban dust and road dust from the
construction that has occurred in the vicinity. These areas will be targeted for
focused cleaning.
7
NYC-WTC 000096507