NYC 9/11 Public Portal Document
02/24/2006 14:29 518-457-1301 NYS LABOR-ENG. SVCES PAGE 05/07
NYS pepartmont or Laaor
orkforce
4 Linda Angello, Commissloner
rK
George E. Pataki, Governor you
Put us to work for
WORK PLAN
REGULATORY SUBMITTAL PART I •-
4.5 ELEVATOR SERVICE floors which
elevator shafts will be vented to the top
This section indicates that the ng
will be
placed under negative pressure to filter and control the vented air. However, project work
this proposed method All asbestos
request detail drawings don't agree with conditions and procedures within existing site--
all
plan procedures shall correspond with amendments and decision reopeningsfor the project.
specific variance decisions, decision
DECONTAMINATION& CLEARANCE
6.1 OPERATION I -- CLEAN ZONE -stripped
on the first floor will be sealed of gut
This section indicates that three zones However, no details regarding specified
decontaminated and then clearance achieved and utilization
procedures (is, tic'fl system enclosures
removal/handling
/handlningt and cleaning
requirements. work nareat~ preparation requirements,s
procedures, etc.) to complete these tasks were apparent.
6.2 OPERATION H — EXTERIOR CLEANING
specified procedures (i.e. decontamination
No spec fic scope of work, or details regarding
utilization requirements, work area
system enclosures construction, placement and removal/handling methods,
preparation requirements, wastewater collection methods,
were apparent.
cleaning and clearance procedures, etc.) to complete these tasks
6.3 OPERATION III — GUT STRIP
o 6.3.1 Building Envelope Preparation Work
still contain 13'TC dust,
It is unclear how operable window hidden surfaces that may
will be cleaned prior to sealing of the windows as critical barriers. Also, the façade
be thoroughly defined
cleaning procedures during erection of the scaffolding must
installation and
within the work plan. Also, the specific details regarding barrier
establishment of containment at the gash area must also be addressed
o 6.3.2 Establishment of Negative Air Pressure
for alternate
This section refers to a site-specific variance "to be solicited"
procedures shall correspond with all
procedures. All asbestos project work plan
-specific variance decisions, decision
conditions and procedures within existing site
amendments and decision reopeningsfor the project.
o 6.3.3 Material Shredder
proposed shredding operations.
More information must be included regarding any
proposed must
For instance, adequate manufacturer information on whatever unit is
for the shredding
be provided, as well as information regarding isolation barriers
to be
operations within the work area, and all appropriate engineering controls
Phone: (518) 467-1536 Fax: (518) 457-1301
Room 164, Albany, NY 12240
W. Averell Harriman State Office Campus, Bldg. 12,
www,la bor.state.ny.us
NYC-WTC 000095864
OCR can misread numbers and units. Confirm readings against the page image before using them.