NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 01/20 JOHN STREET 1001104, 65/22
Document / 1 page

20 JOHN STREET 1001104, 65/22

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000094361
Page image
Scanned page image, NYC-WTC_000094361
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. Floor ROOF $ FACADE 20 JOHN Zip 10038 STREET Borough Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block 65 Inspection Date: As NOTED Lot Squad # Badge # 22 N/A Basis of Inspection WTC Survey A020 Photos Taken es/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: As NoTED SUNDAY OCTOBER 6 2002 (0600AM-1100AM) THE CUEAN UP OF THE NORTH FACADE OF THE PREMISE WAS CONDUCTED TODAY. A PLASTTO DUKE WAS CONSTRUCTED TO COLECT RUN OFF WATER. A DECONTAMINATION TRUCK WAS UTLIZED FOR WORKER DECON- AIR SAMPUNG WAS PERFORMED BY CHETRAM RAMRAS (CERTIFICATE AH 98-19842 EXP 01/03) OF WARREN E PANZER. THE AIR SAMPLES WERE RUN ON THE OPPOSITE SIDELALK. AT THE CONCUSION OF THE CUEAN UP ACTIVITIES I CONDUCTED A VISUAL INSPECTION OF THE CHANED SURFACES AND OBSERNED NO VISIBLE LUTC DEBRIS. THURSDAY OCTOBER 10 2002 (0800AM-OB00PM) THE CUEAN UP OF THE REAR FACADE (SOUTH FACADE) WAS CONDUCTED TODAY. AIR SAMPLNE WAS PERFORME BY FESTY OSEMWEGIE OF WARREN & PANZER (CERTIFICATE # AH 01-01030 EXP 01/03), THE AIR SAMPLES WERE PUN ON THE REOF OF 1B JOMN STREET. THURSDAY OCTOBER 11 2002 (0800AM-0800DM) THE CUEAN UP OF THE ROOE OF THE PREMISE WAS CONDUCTED TODAY AIR SAMPUNE FOR THIS PORTION OF THE CLEAN UP PROIECT WAS PERFORMED BY IDRIS IDOLM (CERTIFICATE # AM-O2 11201 E8P 05/03). UPON COMPLETION OF THE CUEAN UP ACTIVITIES I CONDUCTED A VISUAL INSPECTION OF THE CLEANED SURFACES AND I OBSERNED NO VISIBLE LTC DEBRIS. THE CIEAN UP PROJECT AT THE PREMISE 1E NOLS COMPLETE. NOTE: THE CUEAN UP OF THE NORTH FACADE OF 20JCHN ST & THE CLEANUP OF THE NURTH FACADE OF 18 JOHN ST OCCURRED SIMULTANEDUSUY. FOR THE PURPOSES OF AIR MONITORING, THE FACADES OF THESE TWO BUILOINES WERE TREATED AS ONE WUORK AREA. Rl NYC-WTC_000094361

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000094361Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →