345 CHAMBERS STREET; Block: 16; Stuyvesant HS — page 58
(EDS/SAED): None detected Amphibole Asbestos Type: None detected
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
(EDS/SAED): None detected Amphibole Asbestos Type: None detected
Summary NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
Worker safety is the sole responsibility of the asbestos abatement contractor. 1.2 Scope of Work A.
Summary Asbestos project notification and inspection report form required for NYC DEP and Department of Buildings submittal.
ASBESTOS ASATSMENT CONTRACTOR 12. Name ETS Cotmecting, Inc. 13.
Summary Document listing seven contractor companies authorized for asbestos removal and cleanup operations at the WTC site.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter I of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Asbestos Removal Corp invoice dated August 6, 2002, detailing charges for asphalt and gravel roof cleanup at 120 Liberty and 125 Cedar.
asbestos relates wank I am tuns ar with Federal Warren & ?
Summary Label or header page identifying the location as 41 Park Row within the WTC environmental records series.
Slructures ctectc4 [14°1 Floor Apt. # 14A 01 04.31 1300.36:20 No Asbestos Structures Detected 81 floor Apt. # 8B __________f 01204.32
Summary Single-page document containing identification codes and file references for World Trade Center environmental records at 120 Liberty Street.
17 t 631-924-SOSO >~y Dispo of silo(s) 'Imperial/COB 47, 11 Boggs Rd., PA; Southern n• This asbestos
Summary Invoice from Fiber Control Inc. for cleaning additional facade and asphalt roof surfaces at a World Trade Center site in January 2003.
ASBESTOS ABATEMENT 13.
Summary Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1.
Summary Invoice from Fiber Control, Inc. dated July 18, 2002, billing the Department of Environmental Protection for facade cleaning services at multiple job sites.
ASBESTOS ABATEMENT CONTRACTOR 12. Name CL'.I.D.J.I./.s.~r.. ._._._._._._._._`---__-----_13.
Summary Invoice from Benjamin Kurzban & Son Control Inc. for services performed at 122 Nassau Street totaling $100.
Building Dept. or TRUNo ONLY FOR OFFICIAL USE ONLY Tye _ ASBESTOS PROJECT NOTIFICATION - (ASBESTOS INSPECTION REPORT) s ® (S€e fee schedulé) v When submitting this form at the NYC Department of Buildings, the original form
Summary One-hundred-eighteen page document from Testwell Laboratories presenting final air sample results for a lease at 200 Park Avenue.
Deane, This is to inform you that asbestos cleanup activities at the Millennium Hilton e Hotel, 55 Church Street, New York,
Summary A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Asbestos Air Sampling via TEM ATC collected a total of 60 common area and 149 residential unit samples to ascertain the presence or absence of airborne asbestos.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
vacuum and cleaning equipment designed for asbestos decontamination.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Bottom line on asbestos, 209 samples taken to date using TEM over a period of months in apartments and common areas an NO ASBESTOS found in 207 samples and 1 structure in the other 2 samples
Summary Summary of ambient air sampling and visual observations at 105 Duane Street following the WTC collapse.
(EDS/ SAED ) - None -Non-asbestos fiber 1• detected ---------------- Asbestos TYP e: None approved TEM
Summary Summary of ambient air sampling and visual observations at 105 Duane Street following the WTC collapse.
(EDS/SAED): None detected Amphibole Asbestos Type: None detected ---------------------------------------------------------------------------------------------------------------------------------- The
Summary Summary of ambient air sampling and visual observations at 105 Duane Street following the WTC collapse.
s=5um Struct/mm2 Struct/cc nam/m3 Chrysotile Asbestos 0 0 0 0
Summary Summary of ambient air sampling and visual observations at 105 Duane Street following the WTC collapse.
s 5um Struct/mm2 Struct/cc nom/m3 Chrysotile Asbestos 0 0 0 0 0 0 0.0 0.0000 0 Amphibole Asbestos 0