Asbestos results fax cover, 124 Nassau Street, May 2002 — page 5
Summary Fax cover sheet from Franc-Men Realty Co. transmitting asbestos test results for 124 Nassau Street to the DEP.
HEPA vacuum and Asbestos abatement procedures.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary Fax cover sheet from Franc-Men Realty Co. transmitting asbestos test results for 124 Nassau Street to the DEP.
HEPA vacuum and Asbestos abatement procedures.
Summary Inspection report document from SAF Environmental regarding environmental conditions at 124 Nassau Street.
Although this does not constitute asbestos containing material it is suggested that these areas be cleaned using HEPA vacuum and Asbestos abatement procedures.
Summary Laboratory report on TEM analysis of carpet mastic glue samples from residential building common corridors confirming absence of asbestos.
NYC RiFIED ASBESTOS INVESTIGATOR. yI ,Y B S.JOS INSPECTOR. NYC-WTC 000092675
Summary DEP letter responding to an inquiry about exterior clean-up activities at the World Trade Center site.
clearance EMG has reviewed Airborne Asbestos Results for samples collected for the AMEX Tower asbestos leaning work performed on the building setback areas of floors 4, 5, 10, 20,
Summary NYC DEP asbestos inspection report and project notification form submitted for work at 250 Vesey Place.
Emergency: Actual Date and Time of Emergency Method of Asbestos Abatement: Removal Sq.ft.
Summary Chain of custody form for bulk analysis samples collected from 93 Nassau Street on February 23, 2002.
NYC 9/11 Public Portal Document APR-06-2004 11:46 E:cNI-IM LALCJPATQRY LINT P.02%02 DEPART-XNT OF ENVIUMaNTAL PROTECTION ASBESTOS CONTFt)I, PROGRAM
Summary NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
with any asbestos supervisor, asbestos handler and asbestos project designer.
Summary NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
, asbestos handler and asbestos project designer.
Summary NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
, asbestos handler and asbestos project designer.
Summary NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
Please call me with any asbestos supervisor, asbestos handler and asbestos project questions.
Please call me with any asbestos supervisor, asbestos handler and asbestos project questions.
Summary Cover sheet for a fax transmission from DEP regarding the 105 Duane Street site file.
The buildings were constructed of cement, steel, glass, gypsum wallboard, acoustical tile ceilings, sprayed-on insulation (asbestos-containing and non-asbestos types
Summary Letter enclosing two reports summarizing asbestos testing data for 41 Park Row sent to the DEP.
Asbestos Present Total % Asbestos B-01204-01 201091885-01 Yes <1.% !
Summary Cover letter enclosing air and bulk sampling results for 86 Trinity Place, 22 Thames, and 65 Broadway.
Trace - Asbestos found is 1% or less; not considered ACM.
Summary Laboratory report on TEM analysis of carpet mastic glue samples from residential building common corridors confirming absence of asbestos.
ASBESTOS 112 2nd floor east side Yellow 100.0 None No Asbestos Detected 030217118-0064
Apartment 11B Asbestos and Lead ntrast scopy The asbestos and lead samples
Summary Report detailing asbestos inspection results for the 130 Cedar Street site.
The inspection was conducted in compliance`wlth the Asbestos Hazardous Emergency Response Act (AHERA) and the New York City Department of Environmental Protection Asbestos Control Program.
Dust Asbestos Types: Chrysotile Trace Other Materlak Animal hair 2. %.
Summary Laboratory analysis results for bulk dust and debris samples collected from the roof of 30 West Broadway.
Asbestos Present Total % Asbestos 26-050602-01 202051557-01 No NAD DUS-001 Location: Roof, 16th Floor, SE Corner
Summary Laboratory analysis results for bulk dust and debris samples collected from the roof of 30 West Broadway.
Asbestos Present Total % Asbestos 26-050602-13 202051557-13 Yes <1.% DEB-001 Location: 15th Floor, At North