310 GREENWICH STREET Block: 142 Lot: 25 BIN: 1083239 40 Harrison Street/Independence Plaza — page 124
REPORT ASBESTOS FIBER ANALYSIS BY TRANSMISSION ELECTRON MICROSCOPY (TEM) Performed by EPA 40
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
REPORT ASBESTOS FIBER ANALYSIS BY TRANSMISSION ELECTRON MICROSCOPY (TEM) Performed by EPA 40
Summary Chain of custody form for asbestos samples commissioned by the building management at 211 West Broadway.
Asbestos - Lead - Phase 1 & 2 -Air Quality - OSHA & HAZMAT Regulatory Review - Compliance ,inspecting Reporting And Project Monitoring NYC-WTC 000094564
Summary October 2001 TEM air monitoring inspection report for common areas and apartments at 310 Greenwich Street.
REPORT •ASBESTOS FIBER ANALYSIS BY TRANSMISSION ELECTRON MICROSCOPY (TEM) Performed
Summary Fax cover sheet from Buchbinder & Warren LLC dated March 25, 2002, transmitting environmental assessment documents to the DEP.
3/23/2002 Asbestos Analysts of Bulk Materials by PLM via the NY State ELAP 198.1 Method Mnn
Summary Cover sheet for environmental testing report prepared for Black Diamond LLC at 88 Greenwich Street.
EMSL Project ID: Analysis Date: 12131/01 Asbestos
Tables 3,4, and 5 show the number of buildings and areas within the buildings that were sampled for asbestos, SVF, and minerals in lower Manhattan and the comparison units above 59th Street
Summary Cover page for a fax transmission from S & L Brothers LLC to an EPA officer dated January 29, 2002.
Asbestos FiberAnalysls by TI nsmission Electron Microscopy (TEM) Performed by EPA 40 CPR Part 763 Final Rule (AI IE"
Summary Certificate of analysis from Environmental Monitoring & Consulting Associates reporting airborne asbestos levels at 71 Broadway in September 2001.
EMSL Project ID: Analysis Date: 1/17/02 Asbestos