Air monitoring plan Part III, 30 Warren Street, January 2006 — page 8
Summary Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
Asbestos 1. ACM each 1. 6.0 LPM/8hr 1.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
Asbestos 1. ACM each 1. 6.0 LPM/8hr 1.
Summary Agenda listing panelists from federal agencies, unions, and city departments for a March 2004 conference on post-9/11 air quality.
NYC 9/11 Public Portal Document products of combustion, volatile organic compounds, acid mists, heavy metals, soot, fibrous glass, asbestos, silica, gypsum, pulverized concrete and pulverized glass.
Summary EPA forwards WTC background study documents regarding building access and residential access to multi-agency recipients for 9/11 response coordination.
CPA will analyze each of the samples collected for asbestos and lead.
Summary EPA distributes WTC background study documents on building access and sampling facts to federal, state, and local agencies involved in post-9/11 response.
SPA will analyze each of the samples collected for asbestos and lead.
Summary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
With the exception of asbestos, the extremely limited air sampling data for specific building constituents in indoor air dictated that an assessment approach had to be based on historical data relating
Summary A sample log recording pre-cleaning, post-cleaning, and third-cleaning air and wipe test results for pilot cleaning operations.
Post-cleaning Post-cleaning Post-cleaning Post-cleaning Post-cleaning Post-cleaning Post-cleaning Post-cleaniny Post-cleaning Post-cleaning Post-cleaning Post-cleaning Post-cleanig Post-cleaning Post-cleaning NC X= Collected Wipe Asbestos
Summary A sample log recording pre-cleaning, post-cleaning, and third-cleaning air and wipe test results for pilot cleaning operations.
EPA will analyze each of the samples collected for asbestos and lead.
Summary EPA message distributing WTC-related dust agreement documentation to EPA, DEP, CDC, FEMA, health, and OSHA representatives.
EPA will analyze each of the samples collected for asbestos and lead.
Summary Administrative document identifying the location and BIN for properties at 74-90 Church Street.
Based upon the analytical results obtained, EMTEQUE presents the following conclusions: • Asbestos appears to be present in the debris and settled dust throughout the
Summary Report cover for a preliminary environmental assessment regarding remediation at 30 Warren Street in January 2006.
Analytes included Asbestos and the Contaminants of Potential Concern (CoPCs), as defined by the U.S. EPA's COPC Committee.
Summary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Summary Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Summary Forwarding of WTC background study documents including building access and sampling fact sheets to agency recipients.
EPA will analyze each of the samples collected for asbestos and lead.
Summary Forwarding of WTC background study materials and building access fact sheets to DEP staff.
EPA will analyze each of the samples collected for asbestos and lead.
EPA will analyze each of the samples collected for asbestos and lead.
Summary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
MONITORING Each Subcontractor and trade employer shall perform personnel air sampling for the following contaminants during Abatement Phase of the project: particulates as TSP, metals as TSP, asbestos