114 LIBERTY 2 OF 2 — page 10
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Asbestos Air Monitoring 1, Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary EPA confirms that primary and secondary clearance levels for contaminants at 114 Liberty Street have been met.
Asbestos - Eighty-eight air samples were collected before and/or during cleaning events.
Summary Technical specifications for air quality monitoring work at two Manhattan buildings.
The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
samples daily Contract vocation V Pier 6, Bus Sign Asbestos 2-12 hour samples daily Contract vocation W Wash Tent, West Street Asbestos
Summary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Asbestos 1 % asbestos The Asbestos NESHAP (40 CFR Part 61) level at which a material (Bulk Dust) is considered asbestos-containing and subject to NESHAP removal
Summary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Asbestos 1 % asbestos The Asbestos NESHAP (40 CFR Part 61) level at which a material (Bulk Dust) is considered asbestos-containing and subject to NESHAP removal
Summary OCR-distorted text listing media types and analytical parameters for World Trade Center environmental monitoring.
This was decided since pulverized silica would be particulate like and not fiber like as with asbestos and MMVF.
Summary Technical attachment specifying ASTM methods for collecting and analyzing asbestos and lead in settled dust from residential surfaces.
This was decided since pulverized silica would be particulate like and not fiber like as with asbestos and MMVF. NYC-WTC_000140461
Summary EPA correspondence transmitting draft letter to FEMA regarding 114 Liberty with attached documentation and data receipt timeline.
Included in the letter was reaffirmation of DEP’s Asbestos Control Program’s staff observations whereby pre-existing building materials were identified as having suspect asbestos-containing material