Project Monitoring Contract Scope of Work
For
125 Cedar Street
Background
A follow-up visit to 125 Cedar Street, a.k.a. 110 Liberty Street, revealed debris and significant dust
accumulations present on surfaces within the interior of the building. Project monitoring will be done by a
licensed air-monitoring contractor hired by the Department of Environmental Protection (DEP) to oversee the
clean-up of the building’s interior. Environmental sampling will be done before and at the conclusion of the
clean-up activity.
Purpose
The purpose of this contract is to acquire project-monitoring services including site monitoring during clean-up
activities, wipe and air sampling and laboratory analysis. The Project Monitoring Contractor shall provide
personnel experienced and certified in asbestos abatement monitoring, air and wipe sampling, to be on-site, full-
time, during work area preparation and cleaning phases of building interiors.
The Monitoring Contractor shall perform the following tasks:
1. Monitor the cleanup of the building interiors to ensure all activities are being performed in accordance with
the project specifications and the appropriate regulatory requirements;
2. Technicians hired by the Air Monitoring Contractor will collect area and personal air samples;
3. Technicians will collect samples for Total Dust, Asbestos, Metals, Silica, Calcite, Gypsum, Mercury,
PolyAromatic Hydrocarbons (PAHs) and Dioxin;
4. A Certified Laboratory will analyze all samples collected.
Work shall be performed 24 hours per day, seven (7) days per week.
QuaUficatipns
Project Monitors
The Project Monitors must be employees of the Air Monitoring Contractor. The Project Monitors must possess
valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at
least 25 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least
25 asbestos abatement projects. At a minimum at least 3 Project Monitors must be assigned to this project.
Technicians
Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates.
Technicians must have performed air sampling for at least 6 months. At a minimum at least 5 Air Sampling
Technicians must be assigned to this project.