Air monitoring specs, 125 Cedar and 114 Liberty, August 2002

Machine-extracted title · confidence 90%

Technical specifications for air quality monitoring work at two Manhattan buildings.

NYC-WTC_000163360–000163368

Folder label: “E-mails M. Gilsenan

Page image
Scanned page image, NYC-WTC_000163361
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

New York City Department of Environmental Protection Bureau of Environmental Compliance Project Monitoring Contract Scope of Work For 125 Cedar Street

Background

A follow-up visit to 125 Cedar Street, a.k.a. 110 Liberty Street, revealed debris and significant dust accumulations present on surfaces within the interior of the building. Project monitoring will be done by a licensed air-monitoring contractor hired by the Department of Environmental Protection (DEP) to oversee the clean-up of the building’s interior. Environmental sampling will be done before and at the conclusion of the clean-up activity.

Purpose The purpose of this contract is to acquire project-monitoring services including site monitoring during clean-up activities, wipe and air sampling and laboratory analysis. The Project Monitoring Contractor shall provide personnel experienced and certified in asbestos abatement monitoring, air and wipe sampling, to be on-site, full- time, during work area preparation and cleaning phases of building interiors. The Monitoring Contractor shall perform the following tasks: 1. Monitor the cleanup of the building interiors to ensure all activities are being performed in accordance with the project specifications and the appropriate regulatory requirements; 2. Technicians hired by the Air Monitoring Contractor will collect area and personal air samples; 3. Technicians will collect samples for Total Dust, Asbestos, Metals, Silica, Calcite, Gypsum, Mercury, PolyAromatic Hydrocarbons (PAHs) and Dioxin; 4. A Certified Laboratory will analyze all samples collected.

Work shall be performed 24 hours per day, seven (7) days per week.

QuaUficatipns

Project Monitors The Project Monitors must be employees of the Air Monitoring Contractor. The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 25 asbestos abatement projects. At a minimum at least 3 Project Monitors must be assigned to this project.

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months. At a minimum at least 5 Air Sampling Technicians must be assigned to this project.

1 of 8

NYC-WTC_000163361

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163361Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →