114 LIBERTY 1 OF 2 — page 5
Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level Lead in settled dust <25 pg/
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level Lead in settled dust <25 pg/
Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level Lead in settled dust <25 pg/
Parameter Clearance Level Note Asbestos in air 0.0009 free PCMe Primary clearance level Lead in settled dust <25 pg/tf
Parameter Clearance Level Note Asbestos in air 0.0009 free PCMe Primary clearance level Lead in settled dust <25 pg/tf
Summary Chain of custody form dated August 22, 2002, documenting transfer of samples or materials between DEP personnel.
Parameter Clearance Level Note Asbestos in air 0.0009 ficc PCMe Primary clearance level Lead in settled dust <25 pg/tf
Summary Memo summarizing June 27, 2002 LMDC subcommittee discussion of indoor air and exterior facade cleaning programs, including definitional issues and program clarifications.
Visible inspection of building is not sufficient to insure buildings exteriors, including windows, are free of asbestos. What about other pollutants in dust and air - mercury, lead and dioxin where mentioned.
Summary Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.
Asbestos air samples shall be collected in accordance with the procedures specified in NIOSH Method 7400.
Summary Administrative document identifying the location and BIN for properties at 74-90 Church Street.
Dispose of gloves as asbestos contaminated waste at the end of the work.
Parameter Clearance Level Note_________________ Asbestos in air 0.0009 fZcc PCMe Primary clearance level Lead in settled dust
Summary Request to confirm bidder performance ratings in Vendex prior to soliciting bids for WTC indoor clean-up contracts.
Second, we continue to believe that all cleanups have to be treated as minor asbestos projects, and thus the DEP/DOL regulations are applicable.
Parameter Clearance Level Note Asbestos in air 0.0009 free PCMe Primary clearance level Lead in settled dust <25ug/tr
Summary Draft outlining the direct assistance program for residents south of Canal Street, including cleaning and asbestos sampling services.
Air samples will be collected in accordance with the procedures specified in NIOSH 7400 Method and analyzed by phased contrast microscopy (PCM) followed by Asbestos
Summary Volume 1 of the final documentation report for the WTC unoccupied building monitoring program at 125 Cedar Street.
specification issued by the New York City Department of Environmental Protection Action Environmental Remediation, Inc., a New York State Department of Labor (NYSDOL) licensed asbestos
Summary A transmittal form for a letter sent to EPA Region 2 regarding World Trade Center environmental matters.
substances, pollutants and tonramuianls that may be present in WTC debris or that has been documented as present tasid-c uruis Post-abatement resting must include, but is not limited to, asbestos
Summary EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Heat stress Heat monitoring Cold stress Cold monitorin Asbestos
Summary EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
PERSONAL AIR MONITORING Each Subcontractor and trade employer shall perform personnel air sampling for the following contaminants during Phase I of the project: particulates as TSP, metals as TSP, asbestos
Summary Administrative label or header page identifying records associated with 10 Cortlandt Street.
investigator measured temperature, relative humidity, carbon dioxide, carbon monoxide, respirable dust, mercury and collected samples for volatile organic compounds, , PCBs, dioxins, fungal spores, total dust, and asbestos
Asbestos air samples shall be collected in accordance with the procedures specified in NIOSH Method 7400.
Summary Draft scope of work for WTC debris/dust residential cleanup program with compliance requirements and regulatory overview.
Air samples will be collected in accordance with the procedures specified in NIOSH 7400 Method and analyzed by phased contrast microscopy (PCM) followed by Asbestos Hazard
Asbestos air samples shall be collected in accordance with the procedures specified in NIOSH Method 7400.