21 SOUTH WILLIAM STREET Block: 29 Lot: 49 BIN: 1000847 23 South William St., 45-47 Stone Street — page 2
The steps included the assessment of building contamination for possible hazardous components, including asbestos.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
The steps included the assessment of building contamination for possible hazardous components, including asbestos.
Federal Requirements: Which govern asbestos abatement work or hauling and disposal of waste materials include but are not limited to the following: 1. U.S.
Summary Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Federal Requirements: Which govern asbestos abatement work or hauling and disposal of waste materials include but are not limited to the bllowing: 1. U.S.
Summary Fax cover sheet from QES&T submitting a proposed work scope and TEM air sample reports to the DEP for 56 Nassau Street in September 2001.
the asbestos fiber concentration. 10.
Federal Requirements: Which govern asbestos abatement work or hauling and disposal of waste materials include but are not limited to the bllowing: 1. U.S.
Summary Memorandum from the Commissioner regarding building inspections and safety measures for employees returning to work.
Concerns have been expressed regarding the potential for asbestos to be NYC-WTC_000150513
Summary List of Manhattan buildings with details on air sampling results and clean-up activities.
Wet-wipe and HEPA vacuum by asbestos contractor as “precaution”. TEM air sampling on each floor.
Summary Facade inspection form for a building at 10 South Street with results recorded for four cardinal directions.
The steps included the assessment of building contamination for possible hazardous components, including asbestos.
Summary Joint memorandum from NYC DEP and DOH advising building owners on post-9/11 maintenance, re-occupancy issues, and hazardous material assessments including asbestos.
The steps included the assessment of building contamination for possible hazardous components, including asbestos.
Summary Forwarded news article discussing increased asbestos-related disease risk for Lower Manhattan residents following the WTC collapse.
Levin said that for the vast majority of people exposed to asbestos ?
Summary Memo requesting review of an asbestos abatement document draft by multiple stakeholders before submission.
here today with the EPA and our federal, state and city partners to announce the launch of a comprehensive program to allay the fears of Lower Manhattan residents concerned about possible asbestos
Summary DEP asbestos project notification form and inspection report dated December 12, 2002.
Wet-wipe and HEPA vacuum by asbestos contractor as “precaution”. TEM air sampling on each floor.
Summary Form recording visual inspection results for the facade of 85 Broad Street following World Trade Center events.
The steps included the assessment of building contamination for possible hazardous components, including asbestos, Today, a visual survey of your building's
Summary Letter advising building owners of visible dust accumulations on exterior surfaces dated February 20, 2002.
The steps included the assessment of building contamination for possible hazardous components, including asbestos.
Summary A letter from the DEP notifying owners at 43-47 Broad Street of a visual survey conducted for hazardous components like asbestos.
The steps included the mmlssloner assessment of building contamination for possible hazardous components, including asbestos.
Summary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
Report on the first round of air sampling of asbestos in home study. Memorandum by AM Rock. Washington, DC: U.S.
Summary EPA request for review and feedback on draft scope of work documents for WTC cleaning and air monitoring contractors.
Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates.
Monitor must have performed final clearance iiispeetidns on at least 50 asbestos abatement projects.
Summary Form recording facade and ACM status for 40 [name] following WTC collapse.
The steps included the assessment of building contamination for possible hazardous components, including asbestos.
Summary Letter from DEP requesting bulk sample results and air monitoring data for a site.
The steps included the assessment of building contamination for possible hazardous components, including asbestos.