E-mails M. Gilsenan — page 6
The collected dust is then examined in a laboratory for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airborne asbestos testing as soon as possible.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”. Semantic ranking is unavailable (ollama http 502); showing keyword-only results.
The collected dust is then examined in a laboratory for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airborne asbestos testing as soon as possible.
Summary EPA forwards fact sheets and access agreement forms for WTC cleanup program bidding process to DEP for distribution.
Ilie coUected dust is then examined in a laboratory for asbestos.
Summary Distribution to environmental organizations, legal advocates, health agencies, unions, and academic institutions.
the presence of potential asbestos-type insulation (e.g., fibrous materials)(NYC DOH notification if damaged); vi.
Summary Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
The overloaded air sample was analyzed by TEM and no asbestos fibers were detected.
Summary Letter from a company to DEP confirming minimal dust and cleaning at 1 Battery Park Plaza following the September 11 attacks.
#NY-06-092004-477, Exp. 9/7/04) as well as by the New York State Department of Labor (NYSDOL) as an Asbestos Inspector (Cart.
Summary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Non-cleaned, non-porous deconstruction waste will be disposed of as asbestos waste at a minimum for the reasons indicated previously.
Summary EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
The Owner has retained Airtek Environmental Corp. to conduct Environmental Investigations of the buildings for additional unidentified asbestos containing building materials (ACBM).
Summary EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Non-cleaned, non-porous deconstruction waste will be disposed of as asbestos waste at a minimum for the reasons indicated previously.
Summary Forwarded EPA fact sheets for WTC cleanup program with scopes of work and access agreement documents.
The collected dust is then examined in a laboratory for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airborne asbestos testing as soon as possible.
Summary EPA transmits fact sheets covering cleaning, HVAC, and personal treatment for the WTC cleanup program.
The collected dust is then examined in a laboratory for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airborne asbestos testing as soon as possible.
Summary EPA forwards fact sheets explaining cleanup responsibilities to DEP and other officials.
The collected dust is then examined in a laboratory for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airbome asbestos testing as soon as possible.
Summary EPA provides final versions of scopes of work for the WTC indoor dust cleaning program.
the presence of potential asbestos-type insulation (e.g., fibrous materials); vi.
Summary EPA fact sheets on WTC cleanup procedures distributed to DEP and program staff.
The collected dust is then examined in a laboratory for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airborne asbestos testing as soon as possible.
Summary EPA delivers final scopes of work for WTC indoor dust cleaning and monitoring program to DEP.
the presence of potential asbestos-type insulation (e.g., fibrous materials); vi.
Summary EPA distributes cleanup program fact sheets covering cleaning and treatment procedures to staff.
The collected dust is then examined in a laboratoiy for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airborne asbestos testing as soon as possible.
Summary EPA transmission of fact sheets for World Trade Center cleanup program addressing cleaning, HVAC, and other remediation topics.
The collected dust is then examined in a aboratory for asbestos.
Summary Distribution of World Trade Center cleanup program fact sheets addressing cleaning, HVAC, and remediation procedures.
The collected dust is then examined in a laboratory for asbestos.
Summary EPA final scope of work documents for monitoring and cleaning operations in World Trade Center indoor dust remediation program.
the presence of potential asbestos-type insulation (e.g., fibrous materials); vi.
Summary Distribution of World Trade Center cleanup program fact sheets addressing cleaning responsibilities, HVAC, and related remediation topics.
The collected dust is then examined in a laboratory for asbestos.
Summary Transmittal of fact sheets explaining World Trade Center cleanup responsibilities and procedures for indoor cleaning and remediation.
The collected dust is then examined in a laboratory for asbestos. EPA will notify building residents and owners of the results of the post-cleanup airborne asbestos testing as soon as possible.