All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Summary A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Summary Cover letter dated January 10, 2006 for a regulatory package regarding remediation and deconstruction at 30 West Street.
The requirement for an asbestos building survey includes the requirement that the building facade be investigated for ACBMs.
Summary DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Summary Cover page for a remediation and deconstruction report prepared for CUNY at 30 Warren Street in January 2006.
The requirement for an asbestos building survey includes the requirement that the building facade be investigated for ACBMs.
, dioxin, lead, mercury, etc, but we only tested for asbestos).
Summary Form documenting the tracking and handling of environmental samples collected by the Department of Environmental Protection.
The results of the seven micro vacuum samples indicate that asbestos was present at concentrations lower than those observed before cleaning.
Summary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Health-Based Benchmarks for Asbestos. As addressed in Chapter 2, health-based asbestos standards for indoor and outdoor air do not exist.
Summary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Health-Based Benchmarks for Asbestos. As addressed in Chapter 2, health-based asbestos standards for indoor and outdoor air do not exist.
Summary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Health-Based Benchmarks for Asbestos. As addressed in Chapter 2, health-based asbestos standards for indoor and outdoor air do not exist.
Summary EPA proposes budget and technical activity group details to FEMA including costs for asbestos validation, dioxin monitoring, and metals analysis for WTC.
estimates for asbestos analysis.)
Summary Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Coast Guard, Asbestos 12 hour sample daily Contract 1 South Street, NY.
Summary Form documenting the tracking and handling of environmental samples collected by the Department of Environmental Protection.
Asbestos Before Cleaning Samples - Pre-cleaning wipe samples were collected for asbestos.
Summary Request for review of monitoring contractor specifications for air sampling, including sampling methodologies, limits of detection, and clearance criteria, with reference to prior…
Asbestos Air Sample Collection and Analysis I.