94 1/2 GREENWICH ST. — page 3
NYC 9/11 Public Portal Document FEB-25-2002 1149 BANHM LABORATORY UNIT P.04i07 BUREAU OP ASR, NOISE & RAZAk UVVV OWA1j1W ASBESTOS/LEAD CONTROL
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
NYC 9/11 Public Portal Document FEB-25-2002 1149 BANHM LABORATORY UNIT P.04i07 BUREAU OP ASR, NOISE & RAZAk UVVV OWA1j1W ASBESTOS/LEAD CONTROL
Summary Chain of custody document tracking the collection and transport of bulk samples from 67 Greenwich Street for asbestos analysis.
Asbestos PLM ('vs Asbestos TM I I Lead I I ANALYSES REQUESTED:
Summary Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
Each employee involved in abatement activities must have completed City of New York asbestos training, shall be a certified asbestos worker and/or supervisor by the City of New York, and shall
Summary Form for reporting emergency asbestos abatement actions related to WTC debris, including location and method details.
Emergency Asbestos Clean up @ 150 Franklin Street, New York, NY Dear Sir: Please be advised that D.S.A. performed and Emergency Asbestos Clean up at ISO Franklin Street
Summary Emergency response diagram for the Asbestos Control Program outlining inspection procedures for roof and facade conditions.
ANALYSES REQUESTED: Asbestos PIM IV Asbestos TEM [ Lead I DATE 2/3/62 :TIME 4:05р ACCEPTED BY PRINT COMMENTS Sofe Cestaxi BEC Lab S P DEP ACP REV 5750 NYC-WTC_000128325
Summary DEP form requiring submission of asbestos inspection reports and emergency details prior to abatement activities.
Rajappan Radhakrishnan NYC Department of Environmental Protection Bureau of Air, Noise and Hazardous Materials Asbestos and Lead Control Program 59-17 Junction Boulevard, 8" Floor Corona, NY 11368 Re: Emergency Asbestos Clean
Summary Chain of custody document tracking the collection and transport of bulk samples from 67 Greenwich Street for asbestos analysis.
- BUREAU OF AIR, NOISE & HAZARDOUS MATERIALS • 'ASBESTOS/LEAD CONTROL PROGRAM 59-17 JUNCTION BOULEVARD CORONA, NY 11368 JOEL A. Nt L • SR., P.R.
Summary Form for recording facade inspection results regarding WTC debris at 94 1/2 Greenwich Street.
PLM IVI Asbestos TEM I I Lead I ] ATE •.
Summary Cover page for a fax transmission containing chain of custody forms sent from the DEP Bureau of Laboratories in April 2002.
ANALYSIS REQUESTED: Asbestos PLM IV1 Asbestos TEM | 1 Lead! Sign Print Sign Print 5. pm 8m pm prn am Prine GleNdA RosALK Siga Steae Bestnk Print paf cuteylal Sign Print Sign NYC-WTC_000129027
Summary Administrative record identifier for the Phase 1 Decontamination Plan binder within DEP Box 52.
Clearance Testing: Aggressive area clearance testing for asbestos will be conducted for all work areas by TEM.
Summary NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Personnel performing the work shall be NYS/NYC certified asbestos handlers.
Summary Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
NYC DEP- Asbestos & Lead Control Program Fax: 718-595-3648 From: Elaine Riess Pages: 2 Date: 12/26/01 El Urgent x For Review • Please Comment E Please Reply D Please Recycl RE:EMERGENCY ASBESTOS ABATEMENT NOTIFICATION REQUEST
Summary Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris.
In addition. if indicated by an (M). the following hazards must be covered: vironmental impairment Liability insurance $—Z, Q003 oo0_aeneral aggregate (exci products) 'Asbestos
Summary Legal agreement between the City of New York and a building owner for WTC debris removal at 112 Fulton Street.
it Envlronrnental Impairment Liability insurance $2, 900, 000 general aggregate (excl products) /Asbestos Liability $j , 000 ;000-_products
Summary Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris from exterior surfaces.
SCHEDULE A In addition if Indicated by an (X) the following hazards must be covered: Environmental Impairment Liability insurance $.L Q2Q. 0000 general aggregate (exci products) Asbestos
Summary Formal agreement between the City and a landowner regarding the removal of foreign material from building exteriors at 94 Greenwich Street.
the name of the $,; 90 ohlfn-rt durum deductible, except as conb actor, and each subcontractor, performing any approved by the CONTRACT MANAGEMENT OFRGE operations Involving the removal of asbestos
Summary NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
NYC 9/11 Public Portal Document C DEP Asbestos and Lead Control Program VAR # W 10.
Summary NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Clearance Testing: Aggressive area clearance testing for asbestos will be conducted for all work areas by TEM.
Summary Document page displaying raw analytical data or charts related to asbestos testing for 92 Fulton Street.
Samples collected from various buildings indicated that some of the debris was asbestos-cor►uining material (ACM).
Summary Formal agreement between the City and a landowner regarding the removal of foreign material from building exteriors at 94 Greenwich Street.
Samples collected front various buildings indicated that some of the debris was asbestos-containing material (ACM).