114 LIBERTY 2 OF 2 — page 3
At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.
At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.
Summary Internal routing form regarding handling of Independence Plaza documents related to World Trade Center legal proceedings.
We further request that EPA direct an asbestos abatement of the hallway floors, ceilings and walls — prior to the installation of new carpet.
Summary Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.
At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.
Summary Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.
Summary Header page of a chain of custody document from the DEP Bureau of Air, Noise, and related services.
Yea Hotnogerous No Fibrous Y«l Color Grey/Black Sample Treatment HoosKBiae Asbestos
Summary Letter from EPA Region 2 summarizing the evaluation of analytical data for asbestos, PAHs, and other contaminants at 125 Cedar Street.
A review of the analytical data for asbestos, polycyclic aromatic hydrocarbons (PAHs), dioxin, lead, mercury, fibrous glass, and silica indicates that the numeric criteria we are using in the Confirmation
Summary EPA Region 2 memo summarizing analytical results for asbestos and other contaminants at 125 Cedar Street.
A review of the analytical data for asbestos, polycyclic aromatic hydrocarbons (PAHs), dioxin, lead, mercury, fibrous glass, and silica indicates that the numeric criteria we arc using in the Confirmation
Summary Letter from a complainant regarding improper asbestos cleanup at 333 [name] and requesting reinvestigation of test results.
From: Uday Singh Fax; 877 746 6636 Date: December 12,2001 Phone: Pages 1+1^ Re: Asbestos
Summary Letter from a complainant regarding improper asbestos cleanup at 333 [name] and requesting reinvestigation of test results.
RECTOR PLACE TOWMTS EMSL Project JD; ASSOOATION/333 RECTOR MACE Ana^Oate; ftW02 Asbestos
Summary Letter reporting total particulate and fiber sampling results from multiple floors of occupied office space.
NYC 9/11 Public Portal Document Department of Environmintal Protection — Asbestos Control Program Laboratory ELAP 11045) 96-05 Horace Harding Expressway- Corona, N.Y. 11368 (718) 593-6309 ANALYTICAL AIR FIBERS REPORT By NIOSH
Summary Letter from tenant representatives requesting environmental testing for contaminants at Independence Plaza following WTC dust exposure.
RESULTS Sample M3350 (Carpet from hallway outside #32F @ fire door, 310 Greenwich St.) contained 1.3 million asbestos structures per square centimeter.
Summary Cover page for a fax transmission containing environmental test results or correspondence related to Independence Plaza.
RESULTS Sample M3350 (Carpet from hallv/ay outside PH fire door. 310 Gretinwich St.) contained 1.3 million asbestos structures per square centimeter.
Summary Cover page for a fax transmission containing environmental test results or correspondence related to Independence Plaza.
J fire door, 310 Greenwich St) contained 1.3 million asbestos structures per square centimeter.
Summary Memo specifying that the final contract work and ledge clean-up were completed in late March 2003.
Also do you agree that the lead wipes indicate clearance was achieved, and with the interpretation on the asbestos? The clearance samples for 5, 7, 8, 9, and 10 (after re-cleaned) are due in today.
Summary Header page of a chain of custody document from the DEP Bureau of Air, Noise, and related services.
What standard will be used to determine that the apartment Is free of asbestos?
Summary Header page of a chain of custody document from the DEP Bureau of Air, Noise, and related services.
What standard will be used to determine that the apartment is free of asbestos?
Summary Letter from EPA Region 2 summarizing the evaluation of analytical data for asbestos, PAHs, and other contaminants at 125 Cedar Street.
A review of the analytical data for asbestos, polycyclic aromatic hydrocarbons (PAHs), dioxin, lead, mercury, fibrous glass, and silica indicates tliat the numeric criteria we are using in the Confinnation
Penny Theodorellys Deputy Director Asbestos Control Program Department of Environmental Protection 59-17 Junction Blvd.
Summary Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
The Asbestos Contractor shall provide with his bid a proposed equipment list, which shall be approved by the Environmental Consultant.