Forwarding WTC air monitoring scope for final review, Aug 2002 — page 62
Summary DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
contain asbestos.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
contain asbestos.
Summary Administrative file header identifying records related to the property at 61 Broadway.
Positive results mean the sample Is asbestos or contains more than one percent asbestos by weight.
Summary Invoice from Fiber Control, Inc. dated July 18, 2002, billing the DEP for work at job sites including 145 Chambers Street.
I am responsible contracted the third party air the asbestos abatement activities In accordance with the Asbestos Control Program Rules.
Summary Memo submitting a proposed air sampling plan to commence on September 14, 2001, near the WTC hot zone.
ACM is any material containing more that one percent asbestos.
Summary Memo submitting a proposed air sampling plan to commence on September 14, 2001, near the WTC hot zone.
ACM is any material containing more that one percent asbestos.
Summary DEP asbestos project notification form for submission to NYC Department of Buildings and DEP, including asbestos inspection reporting requirements.
I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program
Summary Invoice from Fiber Control Inc. dated December 2002 for services performed at the 189 Broadway job site.
I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program Rules.
Summary Invoice from Fiber Control Inc. for cleaning additional facade and asphalt roof surfaces at a World Trade Center site in January 2003.
I have the asbestos abatement activities in parties involved in the asbestos project.
Summary Laboratory report detailing findings from dust bulk and wipe sampling conducted at 59 Maiden Lane in September 2002.
should be considered as qualitative only; Qualitative Analysis: Asbestos analysis results of "Present" or "NVA b No Visible Asbestos" represents results for Qualitative PLM or TEM Analysis only (no accreditation
The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary News release reassuring residents that monitoring shows no dangerous contaminants like asbestos or mercury in New York City drinking water.
Initial results show no detectable levels of asbestos.
Summary EPA air monitoring measurements showing asbestos structures per square millimeter detected at World Trade Center site locations on specified dates and times.
Progr„„s EPA can measure asbestos in several ways.
Summary Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
Date 32 I understand that as the owner of a building where asbestos abatement activity occurs.
Summary Document listing licensed asbestos contractors meeting City requirements including experience, certifications, project history, and violation history for WTC cleanup work.
at least 25 asbestos projects and must have submitted asbestos project notification forms for such jobs with NYC DEP within the last two years.
Summary Memo forwarding contract requirements documentation related to FDNY coordination for World Trade Center cleanup operations.
at least 25 asbestos projects and must have submitted asbestos project notification forms for such jobs with NYC DEP within the last two years.
Summary Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
waste has been placed prior to removal from the work area. 2.64 Strip: To remove friable asbestos from any part of the facility
Summary Cover page of a laboratory report containing analysis results for samples taken from the site at 196 Broadway in February 2002.
Asbestos Present Total % Asbestos RS-1 202042276-06 No NAD Location: Cellar Deseription: White, Homogeneous, Bulk Material Asbestos Types: Other Material: Cellulose Trace, Synthetic fibers Trace, Non-fibrous 100. % T-3 202042276
Summary DEP form amending an existing asbestos project notification filed with the Department of Environmental Protection.
I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance the asbestos abatement activities in accordance with the Asbestos Control Program
Summary Document listing licensed asbestos contractors meeting specific project experience and violation history criteria for WTC site work.
must have performed at least 25 asbestos projects and must have submitted asbestos project notification forms for such jobs with NYC DEP within the last two years.
Summary Findings report for dust bulk and wipe sampling at 59 Maiden Lane dated September 9, 2002.
Acid Soluble Inorganic % Non-Asbestos Inorganic % Insoluble Asbestos by Asbestos by PLM/DS TEM a Chrysotile Present NA ones Chrysotile Present NA a NVA Chrysotile Present — Chrysotile Present NA woe Chrysotile Present NA