17 BATTERY PL 1082634, 15/7501 — page 1
ANALYSIS REQUESTED: Asbestos PLM I.4 Asbestos TEM I I Lead I I Date Time Accepted By
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”. Semantic ranking is unavailable (ollama http 502); showing keyword-only results.
ANALYSIS REQUESTED: Asbestos PLM I.4 Asbestos TEM I I Lead I I Date Time Accepted By
Summary Chain of custody form for asbestos bulk samples collected at 17 Battery Place on October 14, 2001.
Po3% o01 8. a01.2~{ ft-o 3~J0s' 9. 10.20 ANALYSIS REQUESTED: Asbestos PLM (✓I Asbestos TEM I I Lead I I
Summary Chain of custody form for asbestos bulk samples collected at 17 Battery Place on October 14, 2001.
ANALYSIS REQUESTED: Asbestos PLM ('.4' Asbestos TEM ( I Lead I I Date Time
Summary Legal directive from the NYC Corporation Counsel regarding the preservation of World Trade Center documents for litigation purposes.
A third part/, who is independent of the asbestos abatement contractor, must perform air sampling and analysis..
Summary Facsimile transmission cover sheet from the Mayor's Office of Environmental Coordination dated January 2003.
A third party, who is independent of the asbestos abatement contractor, must perform sampling and analysis.
Summary EPA and DEP interdepartmental communication concerning roof and facade cleaning operations and coordination.
• is soii tested for asbestos and other toxic substances? C.
Summary EPA and DEP interdepartmental communication concerning roof and facade cleaning operations and coordination.
• Is soil tested for asbestos and other toxic substances? C.
Summary Frequently asked questions and updates regarding disaster assistance, road reopenings, and victim support funds issued in October 2001.
Is soil tested for asbestos and other toxic substances? C.
Summary Guidance issued by DEP to building owners outlining procedures for cleaning dust and debris potentially containing asbestos.
A third party, who is independent of the asbestos abatement contractor, must perform air sampling and analysis.
Summary Instructions for building owners regarding the safe removal of debris inside structures following the World Trade Center attack.
A thud party, who is independent of the asbestos ebaiement contractor, must perfonn air sampling and analysis.
Summary Department of Environmental Protection memo outlining procedures for cleaning asbestos-containing material.
A third party, who is independent of the asbestos abatement contractor, must perform air sampling and analysis.
Summary Cover sheet for a fax transmission from the Mayor's Office of Environmental Coordination dated September 26, 2001.
A third party, who is independent of the asbestos abatement contractor, must perform dr sampling and analysis.
Summary A letter defending the validity of DEP and contractor data used to clear residential units at 114 Liberty Street for re-occupancy.
anasB ANALYSES REQUESTED: Asbestos PU« [v^3 Asbestos TD- ( 3 lead [ 3 DXT£ - ■;.
Summary A letter defending the validity of DEP and contractor data used to clear residential units at 114 Liberty Street for re-occupancy.
NYC 9/11 Public Portal Document APR-16-2003 15:42 B«'M1 LhBORPTOPY Us IT T-.eszcs ASBESTOS ANALYTICAL REPORT
Summary A letter defending the validity of DEP and contractor data used to clear residential units at 114 Liberty Street for re-occupancy.
ASBESTOS ANALYTICAL REPORT DEP DIVISION OF EMERGENCY RESPONSE AND TECHNICAL ASSESSMENT ASBESTOS LABORATORY
Summary A letter confirming that DEP has completed all specified clean-up and monitoring activities for 114 Liberty Street.
NYC 9/11 Public Portal Document RPR-16-2003 15:42 BAtIHM LHBORRTORY UNIT P.05Z05 ASBESTOS ANALYTICAL REPORT
Summary A letter confirming that DEP has completed all specified clean-up and monitoring activities for 114 Liberty Street.
NYC 9/11 Public Portal Document flPR-i6-2003 15:42 BAJ'WM LkBORATORY UNIT P.05/05 ♦ * ASBESTOS
Summary DEP letter acknowledging a request for information regarding bidders list criteria for World Trade Center remediation work.
Your NYC.gov CRM Correspondence Number is 1-2472418 DATE RECEIVED: 05/08/2002 14:11:51 DATE DUE: 05/21/2002 Message Type: Request for Information Topic; Asbestos Abatement
Building owners are required to submit notifications when they conduct an asbestos project (which includes clean up of asbestos containing material).
Summary Scientific report comparing air quality data from Ground Zero to other pollution events and noting high particle counts.
P. 15 I’oil-Diipnlch: Mining town In Moniana riitloiciJ ihe bonon of ilisttnc from nibesio., fdltlc of what the government Is doing about the asbestos from the twin towers surprised the