NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

NYC-WTC_000456097

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000456097–000456098
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

weather protection, etc. which may be indicated. These specifications must be fully developed in a format suitable for bidding and shall be included with the design documents for the project prepared by the Consultant.

Tlie HS will also be required, in nearly all cases, to prepare detailed cost estimates, constiuction phasing plans, CPM charts, and all regulatory filings. These filings include NYC-DEP ACP-5,-7,-8,-9 & variances, NYS-DOL/DOH variances, NYS-DEC notifications and work plans, and any federal EPA/OSHA/DOT filings or notifications that may be required due to the nature of the hazards within the scope of the work.

Hie HS shall, when required by the City, insert drawings and specification sections prepared by tlie others (clearly marked as such) for remediation/abatement of hazardous materials into bid documents prepared by it under this contract. The EC and the A/E Eirm are responsible for coordinating the final contract documents to incorporate all related work required for the remediation abatement of Hazardous Materials.

If the HS fails to accurately notify the City of locations, areas, components or materials which are to be disturbed, altered, demolished or affected as part of the project, and such items are subsequently disturbed, altered, demolished or affected in any way, and are found to be Hazardous Materials, the HS shall, at its own cost and expense, prepare separate contract documents for the abatement thereof and for any additional work required. In addition the I IS shall be responsible for any damages sustained by the City as a result thereof.

D. CONSTRUCTION SERVICES

Ure Environmental Consultant will also provide project management services during construction. Tlrese services will complement and support the full time project monitoring/air sampling service provided by the Constniction Manager and will be limited to Project Oversight to assure compliance with the specifications and regulatory issues. The services may include:

Interpretation/clarification of bid documents, specifications and/or the types or locations of hazards identified in the survey/assessment. Periodic project oversight by licensed/certified personnel appropriate to the hazard being disturbed or mitigated; Periodic sampling, testing & analyses for the purpose of QA/QC as required by all applicable federal, state and local requirements; Periodic oversight by Senior personnel to ensure compliance with contract specifications; Periodic written reports ( weekly, monthly, at milestones) indicating the progress of the work and the conditions at the site; and Final project closeout reports that document the completion of the work and successful remediation / abatement of the hazardous materials.

CITY_21 MCI 00_014651315

NYC-WTC_000456098

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000456098Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →