weather protection, etc. which may be indicated. These specifications must be fully developed in a format suitable for bidding and shall be included with the design documents for the project prepared by the Consultant.
Tlie HS will also be required, in nearly all cases, to prepare detailed cost estimates, constraction phasing plans, CPM charts, and all regulatory filings. These filings include NYC-DEP ACP-5,-7,-8,-9 & variances, NYS-DOL/DOH variances, NYS-DEC notifications and work plans, and any federal EPA/OSHA/DOT filings or notifications that may be required due to the nature of the hazards within the scope of the work.
The HS shall, when required by the City, insert drawings and specification sections prepared by the others (clearly marked as such) for remediation/abatement of hazardous materials into bid documents prepared by it under this contract. The EC and the A/E Firm are responsible for coordinating the final contract documents to incorporate all related work required for the remediation abatement of Hazardous Materials.
If the HS fails to accurately notify the City of locations, areas, components or materials which are to be disturbed, altered, demolished or affected as part of tlie project, and such items aie subsequently disturbed, altered, demolished or affected in any way, and are found to be Hazardous Materials, the HS shall, at its own cost and expense, prepare separate contract documents for the abatement thereof and for any additional work required. In addition the HS shall be responsible for any damages sustained by the City as a result thereof.
D. CONSTRUCTION SERVICES
The Environmental Consultant will also provide project management services during construction. These services will complement and support the full time project monitoring/air sampling service provided by the Construction Manager and will be limited to Project Oversight to assure compliance with the specifications and regulatory issues. Hie sei vices may include:
• Interpretation/clarification of bid documents, specifications and/or tlie types or locations of hazar ds identified in the survey/assessment. • Periodic project oversight by liceiised/certified personnel appropriate to the hazard being disturbed or mitigated; • Periodic sampling, testing & analyses for tire purpose of QA/QC as required by all applicable federal, state and local requirements; • Periodic oversight by Senior personnel to ensure conrpliarrce with contract specifications; • Periodic written reports ( weekly, monthly, at milestones) indicating the progress of the work and the conditions at the site; and • Final project closeout reports that document the completion of the work and successful remediation / abatement of tire hazardous materials.
CITY_21MC100_002792623
NYC-WTC_000454167
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
7 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
6 shared non-person entities · 1 shared topics · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455928
CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
6 shared non-person entities · 1 shared topics · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
6 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications for site decontamination and disposal of asbestos contaminated materials at 110 Church Street dated October 31, 2001.
6 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
3 shared non-person entities · 1 shared topics · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100009
Agreement between the City of New York and 101 Maiden LLC authorizing removal of foreign material from building exteriors.
6 shared non-person entities · 1 shared topics · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115270
Exhibit B containing general conditions and schedule for a permit application regarding debris removal at 212 Pearl Street.
6 shared non-person entities · 1 shared topics · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Similar indexed content
Similar indexed content
Similar indexed content
Similar indexed content