NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

Site sampling general procedures, field investigation

Machine-extracted title · confidence 44%

Overview of standard operating procedures for collecting soil, water, sediment samples at various locations.

NYC-WTC_000455821–000455835
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Table 6-1

SUMMARY OF SAMPLING PROGRAM

Environmental Media Sample Location Sample Point Sample Depth Equipment Rationale Sample Analysis

Soil Vapor On-site Soil vapor survey 3 feet below Decontaminated or To determine TCL volatile parameters point soil surface disposable soil vapor rods/ soil contamination EPA 600/4-89/017 or tubing, gas tight syringe select VOCs by Portable or sorbent tube and GC (EPA Method 601) personal sampling pump

Surface Soil On-site Throughont site- 0-3 inches Disposable polyethylene To determine TCL +30 and TAL below soil scoop and/or sterile wooden surface soil parameters surface tongue depressor contaniiiiatioii 1995 NYSDECASP

Subsurface Soil On-site Test pit Dependent on Decontaminated To determine TCL +30 and TAL visual charac­ backhoe bucket, disposable subsurface soil parameters teristics and polyethylene scoop and contamination 1995 NYSDEC ASP total organic sterile wooden tongue vapor field depressor screening

SedimentySludge On-site Dry well/catch 0-6 inches below Decontaminated To determine TCL +30 and TAL basin/wastewater/ sediment surface polyethylene scoop sediment parameters sanitary system/storm or split spoon sampler contamination 1995 NYSDECASP drain

Wastewater On-site Wastewater/ 6 inches below Decontaminated long To determine TCL +30 and T AL Sanitary System water surface handle polyethylene drainage wastewater parameters scoop or polyethylene contamination 1995 NYSDECASP bailer

Drainage/Storm Water On-site Dry well/catch basin/ 6 inches below Decontaminated long To determine TCL +30 and TAL storm drain water surface handle polyethylene storm water parameters scoop or polyethylene contamination 1995 NYSDECASP bailer

O

H

s O O O I o o

aC1519\A0930701.doc sc to 6-2

NYC-WTC_000455822

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455822Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →