MEMORANDUM
To: Jeremiah W. Schwarz, Health and Safety Coordinator
Human Resource Administration (HRA)
From: Yousuf Sultan, Industrial Hygienist
Citywide Office of Occupational Safety and Health (COSH)
Date: November 29, 2001
Subject: Re-occupancy Walkthrough
Human Resource Administration, 11 Park Place
Date of the November 2, 2001
Walkthrough:
Participants: COSH: Yousuf Sultan
HRA: Jeremiah W. Schwarz
DC-37: Russell Johnson
HRA occupies the 16'** floor at 11 Park Place, which is managed by GVA Williams, 380
Madison Avenue, New York, NY 10017, (212) 716-3566.On September 11, an
evacuation went in an orderly fashion. A fire safety plan is available in the building and
the “Fire Drill and Evacuation Assignments” have been updated. The above floor has two
types of ventilation systems. The air cooling system on the northeast side of the building
supplies air through an intake directly above the window in room 1600 and the exhaust is
directly above the window in the adjacent room. The southwest side of the building has a
central AC unit and the 16* floor has a separate mechanical room. Currently, the central
AC unit is operating in a re-circulation mode (10 percent fresh air). GVA Williams has
provided COSH and DC-37 with a notarized letter from P.J. Mechanical, which confirms
that all the condensers, were pressure washed and the air filters were replaced. The
floors and work surfaces were noted clean and the office will be fully re-occupied by
HRA on November 5. However, the building management did not have access to the
computer room (HUB room), therefore, the room was not cleaned and it was noted
covered with excessive debris. The window in the computer room was left open and a
desk fan is used to cool the computer equipment. The building management was
contacted and the computer room (including all equipment) was cleaned in the evening
CITY_21MC100_0 09914456