NYC-WTC_000455601
Contract terms for air monitoring/analysis including standards and ELAP/NELAC requirements.
23 shared non-person entities · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗Contract requirements for air monitoring/analysis with regulatory compliance references.
NYC-WTC_000454914–000454916OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF ENVIRONMENTAL COMPLIANCE
To: Mike Nolan, Project Manager Warren & Panzer Engineers, P.C.
From: Leonard Atteloney, Director of Laboratory Services Bureau of Environmental Compliance
Date: April 4,2002
Topic: AIR MONITORING AND ANALYSIS SERVICE CONTRACT
All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). The services required are to be provided during regular business hours and weekends.
The laboratory must be in compliance with the National Environmental Laboratory Accreditation Conference (NELAC) standards and have certification by ELAP in the category of Airborne Asbestos by Transmission Electron Microscopy (TEM) and Phase Contrast Microscopy (PCM). Certification must be maintained for at least 6 consecutive proficiency testing rounds. Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air monitoring for at least 2 years and conducted final clearance inspections on at least 50 asbestos abatement projects. Proof of qualifications must be presented to NYC DEP upon request.
Sampling equipment must be in sufficient quantity to provide the turnaround time on each project. At a minimum the following equipment are required; air-sampling pumps (electric and battery operated) with flow rate capacities of 2 to 10 liters per minute, rotometers, mixed cellulose ester sample filters having pore size of 0.45um(TEM), O.Sum (PCM) and electrical generators .
Project 1
Start Date: To he determined
The NYC DEP shall direct services. Air monitoring and analysis firm must be prepared to mobilize within 72 hours of the contract award. The NYC DEP estimates the monitoring of roof tops and facades of approximately 50 buildings per work zone. There will be 3 work zones in the vicinity of the World Trade Center. Multiple work areas shall be cleaned and monitored simultaneously therefore a minimum of 15 APST must be available for this project.
CITY_21MC100_008756193
NYC-WTC_000454914
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000455601
Contract terms for air monitoring/analysis including standards and ELAP/NELAC requirements.
23 shared non-person entities · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362773
Contract scope of work for asbestos air monitoring and analysis services with NYC DEP.
23 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000332213
CoC document for asbestos air monitoring service contract scope.
22 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267365
Contract scope for NYC DEP asbestos monitoring and analysis service.
23 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284196
Scope of work for asbestos air monitoring and analysis service contract.
23 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267368
Scope of work for asbestos monitoring and analysis contract.
23 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265215
Same scope doc as 11; asbestos control program for air monitoring/analysis.
23 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265212
Contract scope for asbestos monitoring and analysis services; compliance with EPA/OSHA/NYSDOL.
23 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284191
Contract scope document for NYC DEP Asbestos Control Program; scope of work.
23 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000363049
Contract scope of work for air monitoring and analysis services under DEP asbestos control program.
23 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141438
Contract scope defining regulatory compliance and bidding requirements for air monitoring services at the World Trade Center site.
23 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150994
Contract scope for air monitoring and analysis services under the DEP Asbestos Control Program, including compliance with federal and state regulations.
23 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000455601
Contract terms for air monitoring/analysis including standards and ELAP/NELAC requirements.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267368
Scope of work for asbestos monitoring and analysis contract.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000332211
Air monitoring service contract scope and compliance requirements.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284191
Contract scope document for NYC DEP Asbestos Control Program; scope of work.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265215
Same scope doc as 11; asbestos control program for air monitoring/analysis.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000332213
CoC document for asbestos air monitoring service contract scope.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000455601
Contract terms for air monitoring/analysis including standards and ELAP/NELAC requirements.
Similar indexed content
Contract scope of work for asbestos air monitoring and analysis services with NYC DEP.
Similar indexed content
NYC-WTC_000332213
CoC document for asbestos air monitoring service contract scope.
Similar indexed content
NYC-WTC_000267365
Contract scope for NYC DEP asbestos monitoring and analysis service.
Similar indexed content
Contract scope defining regulatory compliance and bidding requirements for air monitoring services at the World Trade Center site.
Similar indexed content