Federal project worksheet instructions, FEMA

Machine-extracted title · confidence 58%

FEMA project worksheet guidance for disaster-damage projects and cost thresholds.

NYC-WTC_000454737–000454758
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

APPLICANT RECORD-KEEPING INSTRUCTIONS

Introduction

General

It is essential that you accurately document the expenses incurred in disaster response and recovery. Accurate documentation will help you to:

Recover all of your eligible costs.

* Have the information necessary to develop your disaster projects.

* Have the information available, which the state and FEMA will need to see, to validate the accuracy of your small projects.

* Be ready for any state or federal audits or other program or financial reviews.

There are many ways to maintain documentation of your records. What's important is that you have the necessary information readily available, and that all this information is in a useable format. Your records must be compiled under the Project Number as shown on FEMA's Project Worksheet. The project number may be established by you to track the project in your system. FEMA will assign an actual Project Worksheet number when the project is entered into the NEMIS database for processing.

A set of five summary records have been developed to assist you in organizing your project documentation. If you already have a system you want to use, you may do so, if it shows the information outlined above.

The summary records are:

1. Force Account Labor .Summary Record—used to record your personnel costs.

2. Force Account Equipment Summary Record—used to record your equipment costs.

3. Material Summary Record—used to record the supplies and materials that you take out of stock or purchase.

4. Rented Equipment Summary Record—used to record the costs of rented or leased equipment.

5. Contract Work Summary Record—used to record the costs or wok that you have done by contract.

CITY_21MC100_006404325

NYC-WTC_000454746

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454746Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 407

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.929 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000152508 · Box DEP Box 26

A memorandum outlining the process for gathering documentation to support federal reimbursement requests for disaster recovery.

Similar indexed content

NYC-WTC_000152259 · Box DEP Box 26

A directive regarding monthly equipment usage reports required for federal reimbursement related to World Trade Center recovery.

Similar indexed content

NYC-WTC_000302305

FEMA project worksheet with burden disclosure for NY disaster-1391 activities.

Similar indexed content

Compare copies and versions →