NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
80 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
NYC-WTC_000451508–000451641OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 10 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 1, 2005 Lower Manhattan Development Corporation Page 70 of 124
PMio sampler will be collocated along side the real-time PMw monitors as a QA check. The Anderson RAAS sampler will rotate on a monthly basis through all real-time PMio monitor locations for the duration of the monitoring program.
10.2.9.1 PMio - Reference Method via Anderson RAAS samplers
Particulate samples whose aerodynamic diameter is < 10 p, will be collected using Andersen RAAS samplers operating in the PMw mode. All samples will be collected over an estimated twenty-four hour sampling interval at a prescribed flow rate of 16.67 liters/minute. This equates to a corrected air volume of 24 m^ per each twenty-four hour sampling event. Pre-weighed Teflon filters (47mm diameter) provided by the subcontracted laboratory will be placed in the RAAS sampler cassette prior to the start of each sampling event.
The sampler specification for the PMw sampler is contained in 40 CFR Part 50 Appendix J. This document specifies the PMw sampling limits, protocol, and instrument specifications. The RAAS systems perform all of the functions required or recommended in the instrument specification part of the standard. The inlet has a 10-micrometer (nominal) cutpoint. The inlet provides wind speed and direction independent sampling and removes particles larger than about 10 micrometers.
Before sampling, the filters are equilibrated to constant temperature and relative humidity conditions and weighed. After sampling, the filters are again equilibrated to the constant temperature and humidity conditions and weighed. The mass concentration is then calculated by dividing the weight of the particulate captured on the filter by the volume of air (at ambient conditions) that passed through the sampler. The flow rate is required to be maintained within 5% of 16.67 liters per minute with a coefficient of variation (a measure of the average short-term variation in flow in %) of less than 2%.
Equipment and supplies utilized with this sampling approach are as follows:
• Filters - Preweighed 47-mm Teflon® filters. Filters should be stored and transported in petri dishes.
• Forceps - Non-serrated forceps should be used to handle the 47-mm filters.
• Anderson RAAS PMw Sampler - A sampling system that meets the requirements of 40 CFR Part 50 Appendix J for the sampling of PMw when operated in the PMw mode. The Anderson RAAS sampler design incorporates a flow-indicating device, a thermometer, a barometer, and a timing control device into the sample monitor.
Manometer - A water or oil manometer is used to calibrate the flows of the PMw samplers.
• Timing/Control Device - A timing device capable of starting and stopping the sampler to obtain an elapsed run time of 24 hr ±1 hr. The accuracy of the timing device should be ±15
L2005-346 Rev. 1
CITY_21MC100_0 02651993
NYC-WTC_000451578
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
80 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
77 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
77 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similar indexed content