NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - September 29, 2005
laboratory. The laboratory completeness objective will be a minimum of 90 percent. This
allows for the potential loss of samples impossible to analyze due to unforeseen
interferences and rejected data following data validation.
9.0 NON-DIRECT MEASUREMENTS (SECONDARY DATA) Previously collected
data and information will not be used to make project decisions or design the sampling
program.
10.0 FIELD MONITORING REQUIREMENTS
10.1 Monitoring Process Design
Refer to Section 7.1.1 for the monitoring design of this project. This section discusses the
areas being sampled, what is being tested, and how often.
10.1.1 Meteorological Data Collection
Potential sources of variability may be due to meteorological data. Data available from
regional National Weather Stations (NWS) such as Newark Airport, LaGuardia and
Kennedy Airports can be used to complement the localized data but it is likely NWS data
may not always be representative of conditions in and around the 133-135 Greenwich
Street and 21-23 Thames Street site. A meteorological station that will be deployed by
LMDC as part of the 130 Liberty Street deconstruction project in the immediate vicinity
of the site may be utilized where needed to provide local meteriological data for
comparison with monitoring data results..
10.2 Monitoring Methods
The following sections provide a brief description of the sampling procedures to be
employed for each parameter and a summary of the required equipment. Step-by-step
operating procedures are included as Attachment C.
10.2.1 Metals (TSP Filters)
Total suspended particulate (TSP) samples to be analyzed for metals will be collected
employing high-volume air sampling techniques in accordance with US EPA standard
reference method 40 CFR Part 50 Appendix B, Reference Method for the Determination
of Suspended Particulate Matter in the Atmosphere (High-Volume Method). Samples will
be collected over an estimated twenty-four hour sampling period. During this period
ambient air will be collected at a flow rate of approximately 1 ma minute. Numbered,
preweighed quartz fiber filters provided by the subcontracted laboratory will be placed in
each sampling system prior to the start of each sampling event. The air sampler draws
approximately 1200-1500 rm through the filter during each sampling event. The TSP
quartz filters will be analyzed for ten (10) metals: antimony, barium, beryllium,
cadmium, chromium, copper, lead, manganese, nickel, and zinc. Equipment and supplies
44
CITY_21MC100_003221697
NYC-WTC_000451238
OCR can misread numbers and units. Confirm readings against the page image before using them.