NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
NYC-WTC_000448520–000448651OCR status: ok · source: pdftotext
Z ■< Z ■<
o Ambient Air Monitoring Program Section No. 8 o co g Quality Assurance Project Plan Revision No.: 0 o 130 Liberty Street - NY, NY Date: September 7, 2005 I Lower Manhattan Development Corporation Page 47 of 124 “0 o c o CT o o' oo "0 cn o o> 03 Table 8-3. Measurement Performance Criteria Table - PAHs by GC/MS-SIM O o QC Sample or Activity Frequency Measurement Performance Criteria Corrective Action DQI o c Field Duplicates 1/week *RPD < 40 when positive results for both Assess laboratory precision, and/or Precision-Overall 3 o samples are > 5x QL qualify data. 3 *No situatiorr where one result is detected at > 5x QL and other result is not detected Internal Standards Every sample. Percent recoveries 25-150% Reanalyze and/or qualify data. Accuracy/Bias (extraction spike) blank, QC Method Blanks 1/batch No target compounds > QL Reclean, reanalyze and/or qualify Accuracy/Bias- data. Contamination Field/Trip Blanks l/day'^’ No target compounds > QL Reclean, reanalyze, and/or qualify Accuracy/Bias - data. Contamination Laboratory Control Sample 1/batch Percent recoveries 60-140% Determine cause of problem, Accuracy/Bias reanalyze, and/or qualify data. Laboratory Control Sample 1/batch Percent recoveries 60-140%; RPDs < 50 Determine cause of problem, Accuracy/Bias and Dupheate reanalyze, and/or qualify data. Precision Recovery Standards Every sample, -50% to +100% of area counts in Reanalyze and/or qualify data. Accuracy/Bias (pre-analysis spike) blank, QC continuing calibration standard; + 20 seconds of retention times in continuing calibration standard Field Spike Every Sample Percent recoveries 60-120% Reanalyze and/or qualify data. Accuracy-Overall (prior to sampling)-13C- fluorene at 1000 ng Data Completeness Check NA Field 80%, Laboratory 95% NA Data Completeness PUF/XAD Media Cleaning 1/batch cleaned No target compounds > QL Reclean and retest media. Accuracy/Bias- Verificatiorr Check Contaruinatiorr PFTBA Tune Every day, prior Masses within 0.45 amrr of target mass for Rehine instrument, reanalyze PFK. Accuracy/Bias to saiuple ruasses 69, 219, and 264 o analysis H k; Field duplicates may not be consistently collected at a frequency of 1/week during Phases I and II as the location selected for analy sis will be dictated by PMio measurements. I (2) Will be collected at a frequency of 1/day; during Phase I and II only 1 field/trip blank per week will be analyzed. to
s O Reanalyze: refers to reanalysis of same extract.
o o I o o co to co co cn wo
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content