NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 132 pages

QA plan for ambient air monitoring, LMDC, 2005

Machine-extracted title · confidence 72%

Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.

NYC-WTC_000448520–000448651
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

Z ■< Z ■<

o o io Ambient Air Monitoring Program Quality Assurance Project Plan 130 Liberty Street - NY, NY Section No. 13 Revision No.: 0 Date: September 7, 2005 co

I ■D o Lower Manhattan Development Corporation Page 100 of 124 c o CT o o' ■D 00 o CD to 3. o 03

Table 13-4. Summary of Calibration Procedures for Fixed Laboratory Analyses o o Parameter/Instrument Frequency of Calibration Acceptance Criteria Corrective Action o c Asbestos/TEM Alignment of TEM: performed daily NA Perform necessary equipment 3 CD maintenance and check calibration standards. Magnification: monthly 2x SD must be < 5% cumulative mean Camera Constants: monthly 2x SD must be < 5% cumulative mean Chrystotile Beam Dose: quarterly Fibrils must be visible for minimum of 15 seconds Spot Diameter: quarterly Var iatiorr of spot diarrreters rrrust be < 25% of the mean EDXA Resolution: quarterly Mn K , peak has resolution < 175 eV Perform necessary equipment at full width half maximum_________ maintenance and check calibration Plasma Asher: quarterly Used to calculate time needed to standards. remove 10% of collapsed mixed cellulose ester filter_______________ Grid Opening Measurement: Variation of grid openings must not performed on 2% of grid lot to be > 5% of the mean determine average grid opening in mm^ Silica/XRD Standard: daily analysis 80-120% of true value Perform necessary equipment Initial Calibration: whenever there is Acceptable daily standard analysis maintenance and check calibration a change in hardware or when a new results calculated using this curve; standards. set of calibration reference standards intercept value less than 5 pg for are prepared primary peak curves o PMio Balance Calibration: daily before use ±3 pg Perform necessary equipment H and every 10 samples (200.000 mg) maintenance and check calibration K Calibration Verification: daily before ±3 pg standards. I to use (100.000 mg) S o o o I o o co to co co to to

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448620Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →