NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 1301 I bcriy Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 95 of 124
Table 13-3b. Calibration Requirements for the Ohio Lumex RA915+ McrcuiyAnalyzer Equipment Activity Acceptance Corrective Action Criteria Ohio Lumex RA Factory calibration prior NA NA 915+ to purchasing unit and when unit continuously fails operating specifications^"^' Calibration verification: + 20% of true value Perform maintenance performed prior to and and/or consult after each sampling manufacturer event (placed in Test mode, internal test cell containing mercury vapor placed in optical path of instrument) Record of calibration maintained by Quality Assurance Officer.
Asbestos Mercury, Silica and PCBs using a Personal Sampling Pump
A primary cell calibrator will be used to calibrate field sampling pumps. Calibration information (i.e., date, times, equipment make/model/serial number, and results of calibration) will be recorded in calibration logbooks.
Flow Rate Calibration - Prior to first use, or in the event that the sampling pump fails the flow rate verification, the flow rate on the pump will be calibrated by setting the flow rate to the respective set points using a suitable flow-measuring device that is NIST traceable.
PCDDs/PCDFs and PAHs using a PS-1 High Volume Sampler
The initial calibration of the PS-1 sampler will be performed using a critical orifice serving as a reference standard in concert with a water manometer. The critical orifice calibration will be performed by the manufacturer (Tisch) and is NIST traceable. The sampler will be calibrated on-site using a certified flow orifice device before and after each sample collection period to determine volumetric flow rates. All calibration measurements will be standardized to 760 mm Hg and 25°C.
Table 13-3c summarizes the calibration procedures associated with the PS-1 samplers.
CITY_21MC100_0 03219931
NYC-WTC_000447986
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
81 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441561
Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content