Quality Assurance Project Plan, AMBIENT AIR MONITORING, 130 LIBERTY ST

Machine-extracted title · confidence 42%

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

NYC-WTC_000443239–000443370
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 1301 I bcriy Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 95 of 124

Table 13-3b. Calibration Requirements for the Ohio Lumex RA915+ McrcuiyAnalyzer Equipment Activity Acceptance Corrective Action Criteria Ohio Lumex RA Factory calibration prior NA NA 915+ to purchasing unit and when unit continuously fails operating specifications^"^' Calibration verification: + 20% of true value Perform maintenance performed prior to and and/or consult after each sampling manufacturer event (placed in Test mode, internal test cell containing mercury vapor placed in optical path of instrument) Record of calibration maintained by Quality Assurance Officer.

Asbestos Mercury, Silica and PCBs using a Personal Sampling Pump

A primary cell calibrator will be used to calibrate field sampling pumps. Calibration information (i.e., date, times, equipment make/model/serial number, and results of calibration) will be recorded in calibration logbooks.

Flow Rate Calibration - Prior to first use, or in the event that the sampling pump fails the flow rate verification, the flow rate on the pump will be calibrated by setting the flow rate to the respective set points using a suitable flow-measuring device that is NIST traceable.

PCDDs/PCDFs and PAHs using a PS-1 High Volume Sampler

The initial calibration of the PS-1 sampler will be performed using a critical orifice serving as a reference standard in concert with a water manometer. The critical orifice calibration will be performed by the manufacturer (Tisch) and is NIST traceable. The sampler will be calibrated on-site using a certified flow orifice device before and after each sample collection period to determine volumetric flow rates. All calibration measurements will be standardized to 760 mm Hg and 25°C.

Table 13-3c summarizes the calibration procedures associated with the PS-1 samplers.

CITY_21MC100_003237788

NYC-WTC_000443334

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000443334Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →