Environmental Community Air Monitoring Plan

Machine-extracted title · confidence 50%

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

NYC-WTC_000447434–000447562
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005

13.0 TESTING, INSPECTION, MAINTENANCE AND CALIBRATION REQUIREMENTS

13.1 Instrument/Equipment Testing, Inspection, and Maintenance

13.1.1 Field Equipment

This section describes the procedures and documentation activities that will be performed to ensure that all field analytical instrumentation and equipment are available and in working order when needed. Instrument maintenance logs must be kept and instrumentation must be checked prior to use. The field instrument preventative maintenance program is designed to ensure the effective completion of the sampling effort and to minimize instrument downtime. The maintenance responsibilities for field instruments will be assigned to the AIRTEK Field Sampling Coordinator. Field personnel will be responsible for daily field checks and calibrations and for reporting any problems with the instruments. The maintenance schedule will follow the manufacturer’s recommendations. Field personnel will also be responsible for ensuring that critical parts are included with the field instruments. Critical spare parts will be immediately available to reduce potential downtime. The inventory will primarily contain parts that are subject to frequent failure, have limited useful lifetimes, and/or cannot be obtained in a timely manner. A spare set of equipment will be maintained on-site to facilitate network continuous operation in the event of equipment failure that cannot be remedied by in situ repair. Additional instruments and equipment will be available within 1 -day shipment to avoid delays in the field schedule. A list of equipment that will be in use each day for the 3 station network as well as the number of spare pieces of equipment on- is included in Attachment D.

84

CITY_21MC100_003237488

NYC-WTC_000447517

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000447517Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000440780

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

Similar indexed content

NYC-WTC_000444945

Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content