NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
• Examine all shipping records for accuracy and completeness,
• Sign and date the chain-of-custody immediately (if shipment is accepted) and
attach the air bill,
• Note any problems associated with the coolers and/or samples on the cooler
receipt form and notify the Laboratory Project Manager, who will be responsible
for contacting the AIRTEK Project QA Officer, • Attach laboratory sample
container labels with unique laboratory identification and test, and
• Place the samples in the proper laboratory storage.
Following receipt, samples will be logged in according to the following procedure:
• The samples will be entered into the laboratory tracking system. At a minimum,
the following information will be entered: project name or identification, unique
sample numbers (both client and internal laboratory), type of sample, required
tests, date and time of laboratory receipt of samples, and field identification
provided by field personnel.
• The Laboratory Project Manager will be notified of sample arrival.
• The completed chain-of-custody, air bills, and any additional documentation will
be placed in the final file.
77
CITY_21MC100_0 03237481
NYC-WTC_000447510
OCR can misread numbers and units. Confirm readings against the page image before using them.