NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
Completeness Laboratory Completeness
Check 95%
PUF/XAD l^atch cleaned No target Reclean and Accuracy/Bias-
Media Cleaning compounds retest media. Contamination
Verification QL
Check
PFTBA Tune Every day, Masses within Retune Accuracy/Bias
prior to sample 0.45 amu of instrument,
analysis target mass for reanalyze PFK
masses 69, 219,
and 264
(1) Field duplicates may not be consistently collected at a frequency of 1/week during
Abatement and Demolition phases as the location selected for analysis will be indicated
by PMio measurements.
(2)
Will collect samples at a frequency of 1/day; during Abatement and Demolition phases-
only 1 field/trip blank per week will be analyzed
Reanalyze: refers to reanalysis of same extract.
Tab/e 8-4. Measurement Performance Criteria fab/e-PCBs by GC/ECD
QC Sample or Frequency Measurement Corrective DQI
Activity Performance Action
Criteria
Field l/Week *RPD < 40 Assess Precision-
Duplicates when positive laboratory Overall
results for both precision; and
samples are > /or qualify data.
5x QL
*No situation
where one
result is
detected at > 5x
QL and other
result is not
detected
Surrogates Every sample, Percent Reanalyze if Accuracy/Bias
blank, QC recoveries both surrogates
TCMX and outside limits
DBCP 60- or one < 10%,
120% and /or qualify
data.
Method Blanks 1/prep batch No target Reclean, Accuracy/Bias-
compounds > reanalyze, Contamination
Qk and/or qualify
data.
Field/Trip 1/day No target Reclean, Accuracy/Bias-