Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
provided by
TRC on the
chain-of-
custody.
4/D Date Collected The date that Date Yes*
the sample was (mm/dd/yyyy)
collected in the
field.
5/E Volume The sample Text Yes*
Collected volume that
was collected.
Stored as text to
preserve
significant
figures.
6/F Volume Unit A unit Text Yes*
associated with
the volume
collected.
7/G Lab Sample ID The sample ID Text Yes
used by the lab.
8/H Date Received The date that Date Yes*
the sample was (mm/dd/yyyy)
received by the
lab.__________
9/1 Date Analyzed The date that Date Yes
the sample was (mm/dd/yyyy)
analyzed by the
lab.
10/J Analytical The lab method Text Yes
Method used to test for
the presence of
the parameter.
11/K Parameter The full name Text Yes
Name of the
parameter.
12/L Concentration The result of Text Yes
the lab test.
Stored as text to
preserve
significant
figures.
13/M Unit The unit Text Yes
associated with
the
128
CITY_21MC100_003237532
NYC-WTC_000447561
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000447561Source: NYC Law Department, mirrored locally