Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
15.3.2 Laboratory Non-Conformances
Corrective action in the laboratory may occur prior to, during, and after initial
analyses. A number of conditions such as broken sample media, omissions or
discrepancies with chain-of custody documentation, and potentially high
concentration samples may be identified during sample log-in or just prior to analysis.
Following consultation with laboratory analysts and Laboratory Section Leaders, it
may be necessary for the Laboratory QA Manager to approve the implementation of
corrective action. The analytical methods specify some conditions during or after
analysis that may automatically trigger corrective action or optional procedures.
These conditions may include dilution of samples, additional sample extract cleanup,
automatic reinjection/reanalysis when certain QC criteria are not met, loss of sample
through breakage or spillage, etc. If the corrective action is not clear, the Laboratory
QA Manager must notify the AIRTEK Project Manager and AIRTEK QA Officer.
All parties will decide and approve a subsequent corrective action procedure that will
not adversely affect the achievement of project objectives. The analyst may identify
the need for corrective action. The Laboratory Section Leader, in consultation with
the staff, will approve the required corrective action to be implemented by
the laboratory staff. The Laboratory QA Manager will ensure implementation and
documentation of the corrective action. If the nonconformance causes project
objectives not to be achieved, AIRTEK Project QA Officer will be notified. The
AIRTEK Project QA Officer will notify the AIRTEK Project Manager, who in turn
will contact all levels of project management for concurrence with the proposed
corrective action. These corrective actions are performed prior to release of the data
from the laboratory. The corrective action will be documented in both the
laboratory’s corrective action files, and the narrative data report sent from the
laboratory to AIRTEK. If the corrective action does not rectify the situation, the
laboratory will contact the AIRTEK Project QA Officer, who will determine the
action to be taken and inform the appropriate personnel. If necessary, a problem
resolution audit will be conducted.
15.4 Data Validation and Data Assessment Non-Conformances
The need for corrective action may be identified during either data validation or data
assessment. Potential types of corrective action may include data qualification or
reinjection/reanalysis of samples by the laboratory. These actions are dependent upon
whether the data to be collected is necessary to meet the required QA objectives. If
the data validator or data assessor identifies a corrective action situation, the AIRTEK
Project Manager will be responsible for informing the appropriate personnel. All
corrective actions of this type will be documented by the AIRTEK Project Manager
and maintained in the project files.
16.0 DATA REVIEW, VERIFICATION, VALIDATION, AND USABILITY
16.1 Data Review, Verification, and Validation