Inspection memo for 130 Liberty Street, 25 June 2003

Machine-extracted title · confidence 32%

Memo documenting asbestos inspection observations at 130 Liberty Street; building areas defined.

NYC-WTC_000447163–000447164
Page image
Scanned page image, NYC-WTC_000447163
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FROM: Radhakrishnan, Krish

TO: Gilsenan, Michael

COPIED:

BCC:

DATE: 20030626 12:27:20

SUBJECT: FW: 130 Liberty Street (Deutcshe Bank) TRU 00345MN003

FYI

■Original Message From: Lutchmedial, Carlstien Sent: Thursday, June 26, 2003 11:35 AM To: Radhakrishnan, Krish Cc: Theodorellys, Penny; Plumptre, Alphonso Subject: 130 Liberty Street (Deutcshe Bank) TRU 00345MN003

An inspection was conducted on June 25, 2003 of various areas of the building along with Mark Hopper of Tishman (GC), Noel Drago of Ambient Group, and PAL (asbestos contractor). Presently, the asbestos project scheduled for the damaged area of the north face had been completed about the end of May 2003. Inspection revealed that no WTC debris was visible. The damaged areas (7th -24th Fl.) were now "shored up" and enclosed.

There were workers present in the building who were all dressed in full PPE doing general housekeeping duties.

Inspection of the roof revealed that it contained a layer of gravel on a flat roof, beneath the gravel WTC debris was visible. There were numerous openings on the roof which led into the building, also the HVAC equipment was on the roof, none of these were isolated. Hopper said that DDC had been to the roof sometime after September 11 and did a gross clean-up. since then nothing additional had been done.

The facades had not been cleaned and were draped with construction curtains.

Mark Hopper said that they were hired only to restore the structural integrity of the damaged portion of the building, he said he did not have intimate details about the Asbestos issues concerning the building. He referred me to John Leitner of Ambient Group.

Hopper was informed that all final clearance air monitoring results are to be submitted to DEP within 24 hours. In addition, sampling data for the other areas of the building's interior and exterior were to be submitted to DEP. He said he'll forward my request to the appropriate parties.

On follow up I contacted John Leitner of Ambient and was informed that all areas of the building has been deemed to be Asbestos contaminated. This was based on the numerous positive they obtained a while back. Presently, no determination has been made as to when the rest of the building would be cleaned. This matter would be resolved

CITY_21MC100_003212405

NYC-WTC_000447163

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000447163Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →