NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - February 1, 2006
be recorded in the log. Completion of validation and final disposition of the package
will also be documented. All laboratory data will be maintained in a central file to
allow easy retrieval of information and electronic transfer of the data to other parties.
As laboratory analytical results are received, and validated, the results will be saved
to the central file. All laboratory data will be provided by the laboratory in both
electronic and hard copy format. After the data are validated, appropriate
modifications to the data will be made to reflect the changes resulting from data
validation (if any). A second quality assurance review will be performed after the
validated data are entered.
14.5.4 Data Analysis and Reporting
All data reports will present summaries of all validated data collected during the
field investigation.
14.6 Data Tracking and Control
Management of field data is described in Section 14.4.1. Laboratory data will be
maintained as described in the laboratory’s QA Manuals. AIRTEK is the custodian of
the project files and will maintain the contents of the files, including all relevant
records, reports, logs, field notebooks, pictures, subcontractor reports, and data
reviews in a secured, limited access area.
15.0 ASSESSMENT/O VERSIGHT
15.1 Assessments
Technical system audits (TSAs) of both field and laboratory activities are conducted
to verify that sampling and analysis are performed in accordance with the procedures
established in the QAPP.
Field Sampling TSAs
A system audit of field activities including sampling and field measurements may be
conducted and documented by the AIRTEK Project QA Officer (or her designee)
quarterly or at the start of each phase of sampling. The purpose of this audit is to
verify that all established procedures are being followed as planned and documented
and to allow for timely corrective action, reducing the impact of the nonconformance.
The audit will ensure that all personnel have read the QAPP. The audit will cover
field sampling records, field measurement results, field instrument operation and
calibration records, sample collection, preservation, handling, and packaging
procedures, adherence to QA procedures, personnel training, sampling procedures,
review of sampling design versus the sampling plan, corrective action procedures,
and chain-of-custody, etc. Follow-up surveillance will be conducted by the AIRTEK
Field Sampling Coordinator to verify that QA procedures are maintained throughout
115