QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

in the implementation of field sampling programs. Prior to work on this project, field team personnel shall receive project specific training regarding the requirements of this project as detailed in this QAPP and the project Health and Safety Plan (HASP). All field sampling personnel shall have current 40-hour OSHA HAZWOPER training.

All contractors and subcontractors involved in the monitoring activities at buildings under this contract are responsible for completing a background check on their employees prior to employees beginning on-site work and for screening unacceptable candidates from the pool of on-site workers. Contractors are required to maintain records of background checks for 4 years and to make them available to the EPA when requested.

Proof of Primary Contractor personnel qualifications must be presented upon request, including qualifications for wipe sampling, HEPA vacuum and microvacuum sampling, personal monitoring and EIVAC evaluations. The laboratory contractor shall be certified by the National Voluntary Laboratory Accrediation Program (NVLAP). Certification is required to have a high level of quality documentation essential for achieving and maintaining the highest quality in standard industry practices.

2.5.1 Project Monitors

The Proj ect Monitors must possess valid New York State (NYS) Asbestos and Lead Project Monitor certificates. The Project Monitors must have served as a third party project monitor on at least 25 asbestos and lead abatement projects. Project Monitor must have performed final clearance inspections on at least 25 asbestos and lead abatement projects. The Project Monitor must have access to translation services to schedule unit inspections with residents, workers, and/or owners.

2.5.2 HEPA Vacuum and Microvacuum Technicians

HEPA vacuum and microvacuum sampling technicians must have at least one year experience in HEPA vacuum and microvacuum sampling for a variety of contaminants. Employees shall have received specific training in HEPA vacuum and microvacuum sampling methods.

2.5.3 Wipe Sampling Technicians

Wipe sampling technicians must have at least one year experience in wipe sampling for a variety of contaminants. Employees shall have received specific training in wipe sampling methods.

2.5.4 HVAC System Inspectors

HVAC assessments and cleanliness inspections shall be conducted by qualified personnel. At a

-9-

CITY_21MC100_002649182

NYC-WTC_000442672

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442672Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →