Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 1 .iberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 88 of 116

Asbestos Mercury, Silica and PCBs using a Personal Sampling Pump

A primary cell calibrator will be used to calibrate field sampling pumps. Calibration information (i.e., date, times, equipment make/model/serial number, and results of calibration) will be recorded in calibration logbooks.

Flow Rate Calibration - Prior to first use, or in the event that the sampling pump fails the flow rate verification, the flow rate on the pump will be calibrated by setting the flow rate to the respective set points using a suitable flow-measuring device that is NIST traceable.

PCDDs/PCDFs and PAHs using a PS-1 High Volume Sampler

The initial calibration of the PS-1 sampler will be performed using a critical orifice serving as a reference standard in concert with a water manometer. The critical orifice calibration will be performed by the manufacturer (Tisch) and is NIST traceable. The sampler will be calibrated on-site using a certified flow orifice device before and after each sample collection period to determine volumetric flow rates. All calibration measurements will be standardized to 760 mm Hg and 25°C.

Table 13-3c summarizes the calibration procedures associated with the PS-1 samplers.

Table 13-3c. Calibration Requirements for PS-1 Samplers Equipment Activity Acceptance Corrective Action Criteria PS-1 sampler Initial Calibration: NA NA Multipoint calibration performed before first use, quarterly thereafter, after relocation to new site, or after repairs which may affect calibration Single point flow check Within + 20% of the Service PS-1 sampler at normal operating flow flow rate indicated by and perform a new rate on monthly basis the PS-1 sampler multi-point calibration. Orifice Transfer Annual calibration by NA NA Standard manufacturer and when visual inspection reveals new dents in the device.

PM I (I and PM 2 5 I sing a Reference Sam pier

Calibration procedures are as follows:

L2005-346 Rev. 1

CITY_21MC100_003243494

NYC-WTC_000441649

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441649Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.