NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 117 pages

Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 1 .iberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 82 of 116

Table 13-lb. Maintenance, Testing, and Inspection Requirements for the Ohio Liimcx RA915-I- Mcrciiry Analyzer Fault Symptom Possible Cause Corrective Action The battery discharge indicator The battery is fully discharged Charge the battery (red) glows for some time and then goes out when tire analyzer is switched on.

In the TEST mode, relative - Spectral lamp is not switched - Press the "Lamp ignition" deviation R of the measured test on button number differs from the tabulated value by more than - The test cell switch is in idle -Set the switch of the test cell 25 %. position to the working position

- The test cell is out of order - Shake tlie test cell 2-3 times by the TEST (ON/OFF) switch

- t he absorption filter has failed - Replace the filter

Asbestos, Mercury, and PCBs using a Personal Sampling Pump

Maintenance, testing and inspection requirements for the personal sampling pumps are as follows:

• Routine maintenance will be performed according to the manufacturer’s instructions on the following schedule:

_______ Part Replacement Interval (hours) Valves 2,000 Pump Diaphragm 2,500 Dampner 2,500 Motor 4,500

Note: Replacement intervals may be shorter in dusty conditions.

Flow Rate Verification - On a weekly basis, the field technician will verify the sampling flow rate on the sampling pump using a rotameter, bubble meter, or other suitable flow­ measuring device that is NIST traceable. The flow rate should not vary from the set point by more than +10%. If it does, the flow through the pump must be recalibrated.

Respirable Silica using a Personal Sampling Pump

Maintenance, testing, and inspection requirements for the personal sampling pump are as follows:

L2005-346 Rev. 1

CITY_21MC100_003243488

NYC-WTC_000441643

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441643Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

Compare copies and versions →