QA plan reference for deconstruction ambient air monitoring, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
NYC-WTC_000426556–000426687OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 89 of 124
Table 13-lb. Maintenance, Testing, and Inspection Requirements for the Ohio Liinicx RA915+ Mcrcurv AItalyzer Fault Symptom Possible Cause Corrective Action (red) glows for some time and then goes out when the analyzer is switched on.
In the TEST mode, relative - Spectral lamp is not switched - Press the "Lamp ignition" deviation R of the measured test on button number differs from the tabulated value by more than - The test cell switch is in idle - Set the switch of the test cell 25 %. position to the working position
- The test cell is out of order - Shake the test cell 2-3 times by the TEST (ON/OFF) switch
- The absorption filter has failed - Replace the filter
Asbestos, Mercury, and PCBs using a Personal Sampling Pump
Maintenance, testing and inspection requirements for the personal sampling pumps are as follows:
• Routine maintenance will be performed according to the manufacturer’s instructions on the following schedule:
_______ Part Replacement Interval (hours) Valves 2,000 Pump Diaphragm 2,500 Dampner 2,500 Motor 4,500
Note: Replacement intervals may be shorter in dusty conditions.
Flow Rate Verification - On a weekly basis, the field technician will verify the sampling flow rate on the sampling pump using a rotameter, bubble meter, or other suitable flow measuring device that is NIST traceable. The flow rate should not vary from the set point by more than +10%. If it does, the flow through the pump must be recalibrated.
CITY_DEP_WORBY_CANNATA_SUBP_000092019
NYC-WTC_000426645
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000426821
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan reference for deconstruction ambient air monitoring, Sept 2005.
Similar indexed content
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similar indexed content
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similar indexed content
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similar indexed content