Ambient Air Monitoring Program QA Plan, 130 Liberty

Machine-extracted title · confidence 42%

Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.

NYC-WTC_000426556–000426687
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 88 of 124

Table 13-la, Maintenance, Testing, and Inspection Activities Associated with Metals (TSP filters) Collected with High Volume Samplers Acceptance Equipment Activity Corrective Action Criteria Gaskets At 3 month intervals, No leaks or Replace as necessary inspect all gaskets in the compression damage sampler evident Brushes Replace after 600 - Stable flow rate Replace as necessary 1000 hrs. of operation Motor Replace as needed Consult manufacturer Obtain the correct for correct model of model motor Tubing and fittings Visually inspect daily No crimps, cracks, or Replace as necessary obstructions; no crossthreading

Mercury (Gaseous) Using a Direct Read Analyzer

Table 13-lb summarizes the inspection, testing, and maintenance activities associated with the gaseous mercury analysis using the Ohio Lumex RA915-I- mercury analyzer.

Table 13-lb. Maintenance, Testing, and Inspection Requirements for the Ohio Lumex RA915+ Mercury Analyzer Fault Symptom Possible Cause Corrective Action Segments of the indicator table - Power cable is out of -Repair the power cable on the display and control unit order- are not highlighted when the analyzer is switched on. - Display unit cable is - Repair the display unit out of order cable

Battery is discharged Charge the battery

The (*) symbol at the display - Battery is discharged - Charge the battery and control panel is not dimmed out when the "Lamp ignition" button is pressed:

-if tlie optical switch is in - Operation is possible only witli - Set tire optical switch into position I attachments positions II or III

- if the optical switch is in - The single-pass cell is - Remove the single-path cell, position II contaminated, compartment check if the compartment windows are contaminated or windows are clean, make sure foreign objects are found in the that there are no foreign objects compartment inside the compartment

- if the optical switch is in - Multi-path cell is - Clean the multi-path cell position III contaminated (see appropriate section)

The battery discharge indicator The battery is fully discharged Charge the battery

CITY_DEP_WORBY_CANNATA_SUBP_000092018

NYC-WTC_000426644

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000426644Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426821

QA plan reference for deconstruction ambient air monitoring, Sept 2005.

Similar indexed content

NYC-WTC_000421972

QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000423219

Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.

Similar indexed content

NYC-WTC_000422676

QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.

Similar indexed content

NYC-WTC_000421711

Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.

Similar indexed content

Compare copies and versions →