QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗QA plan reference for deconstruction ambient air monitoring, Sept 2005.
NYC-WTC_000426821–000426952OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Corporation Page 88 of 124
Table 13-la, Maintenance, Testing, and Inspection Activities Associated with Metals (TSP filters) Collected with High Volume Samplers Acceptance Equipment Activity Corrective Action Criteria Gaskets At 3 month intervals, No leaks or Replace as necessary inspect all gaskets in the compression damage sampler evident Brushes Replace after 600 - Stable flow rate Replace as necessary 1000 hrs. of operation Motor Replace as needed Consult manufacturer Obtain the correct for correct model of model motor Tubing and fittings Visually inspect daily No crimps, cracks, or Replace as necessary obstructions; no crossthreading
Mercury (Gaseous) Using a Direct Read Analyzer
Table 13-lb summarizes the inspection, testing, and maintenance activities associated with the gaseous mercury analysis using the Ohio Lumex RA915-I- mercury analyzer.
Table 13-lb. Maintenance, Testing, and Inspection Requirements for the Ohio Lumex RA915+ Mercury Analyzer Fault Symptom Possible Cause Corrective Action Segments of the indicator table - Power cable is out of -Repair the power cable on the display and control unit order- are not highlighted when the analyzer is switched on. - Display unit cable is - Repair the display unit out of order cable
Battery is discharged Charge the battery
The (*) symbol at the display - Battery is discharged - Charge the battery and control panel is not dimmed out when the "Lamp ignition" button is pressed:
-if tlie optical switch is in - Operation is possible only witli - Set tire optical switch into position I attachments positions II or III
- if the optical switch is in - The single-pass cell is - Remove the single-path cell, position II contaminated, compartment check if the compartment windows are contaminated or windows are clean, make sure foreign objects are found in the that there are no foreign objects compartment inside the compartment
- if the optical switch is in - Multi-path cell is - Clean the multi-path cell position III contaminated (see appropriate section)
The battery discharge indicator The battery is fully discharged Charge the battery
CITY_DEP_WORBY_CANNATA_SUBP_000092849
NYC-WTC_000426909
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
79 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
77 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
72 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
79 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000423219
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426556
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421972
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000422676
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421711
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
Quality assurance plan and project details for ambient air monitoring near 130 Liberty Street, Sep 2005.
Similar indexed content
QA plan for ambient air monitoring program for LMDC deconstruction at 130 Liberty Street.
Similar indexed content
Quality assurance plan for ambient air monitoring, 130 Liberty Street, Sept 2005.
Similar indexed content
Quality assurance plan for ambient air monitoring during LMDC project at 130 Liberty Street.
Similar indexed content