NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 117 pages

Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 10 Quality Assurance Project Plan Revision No.: 0 130 1 iberly Street - NY, NY Date: Augnst 2005 Lower Manhattan Development Coi-poration Page 54 of 116

Equipment and supplies utilized with this sampling approach are as follows:

• OhioLumex RA-915-i- Mercury Analyzer - A portable, self-contained field mercury analyzer used to make real time mercury vapor determinations.

Air Intake Hose with Pre-Filter - The sampling line and first pass filter used to remove particulate from the sample gas.

• Absorption and Dust Filters - Spare filters used as replacements for the internal particulate and mercury absorbing filters in the instrument.

10.2.3 Asbestos

Asbestos sample collection will be performed in accordance with NIOSH Method 7402 - Asbestos by TEM following the recommendations for personal sampling. Samples will be collected at a rate of six liters per minute (6 1pm) for a minimum of eight (8) hours for a resulting total volume of approximately 2.88 m^. To ensure optimum accuracy, the sampling rate will be adjusted, as needed, to produce a fiber density of 100 to 1,300 fibers/mm“.

Pump flow rates of each personal sampling pump, with a representative sampler in line, will be measured before and after sample collection. The pump will be run for 10 minutes prior to checking the flow rate. A suitable rotameter (or bubble meter) will be connected to the filter inlet, the flow screw adjusted to the desired sampling value, and the flow rate observed on the rotameter (or bubble meter) will be verified as constant for a minimum of 20 seconds. Flow rates will be recorded on Field Sampling Data Sheets or an equivalent field logbook.

Immediately prior to collecting a sample, the sampler will be fastened to a location (i.e., on a tripod) near the individual’s breathing zone, the top cover of the filter cassette cowl extension (“open face”) will be removed and positioned “face down” in the sampler. The joint between the extender and monitor body will be wrapped with tape to hold the cassette securely in place and to provide a surface to identify the cassette. By inserting a pin through the hole near the display screen, the elapsed time indicator is reset prior to sampling.

At the end of the sampling period, the top cover and small end caps are replaced. Samples are transported upright to the laboratory in a rigid container with packing material to prevent jostling or damage. To avoid electrostatic forces from causing fiber loss from the sampling filter, untreated polystyrene foam will not be used for any of the shipping container materials.

Equipment and supplies utilized with this sampling approach are as follows:

• SKC Eeland Eegacy Personal Sampling Pump (or equivalent) - 5 to 15 1pm

L2005-346 Rev. 1

CITY_21MC100_003243460

NYC-WTC_000441615

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441615Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

Compare copies and versions →