Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 8 Quality Assurance Project Plan Revision No.: 0 130 1 iberly Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 50 of 116

modifications to achieve quantitation limits that are significantly below the project Action Limits. The laboratories selected will, at a minimum, meet the project quantitation limits included in Table 8-1.

Laboratories will need to adjust all quantitation limits based on dilutions, sample volumes, extract/digestate volumes, and cleanup procedures. In all cases, the adjusted quantitation limit (or sample quantitation limit) must be below the project Action Limit. In establishing the required quantitation limits for this program, these factors were considered in ensuring the project Action Limits would be achieved.

Sensitivity will be maximized by following the EPA and NIOSH methods, utilizing experienced/trained laboratory personnel, and conducting laboratory audits.

8.2.6 Completeness

Completeness is a measure of the amount of valid data obtained from a measurement system compared to the amount that was expected to be obtained under normal conditions. “Normal conditions” are defined as the conditions expected if the sampling plan was implemented as planned.

Field Completeness Objectives

Field completeness is a measure of the amount of (1) valid measurements obtained from all the measurements taken in the project and (2) valid samples collected. With the exception of the real-time measurements, the field completeness objective will be a minimum of 80 percent. This allows for the potential loss of samples due to sampling problems or media breakage during transport. The completeness objective for the real-time measurements (e.g., PMio, PM2.5, gaseous mercury) will be a minimum of 90 percent.

Laboratory Completeness Objectives

Laboratory completeness is a measure of the amount of valid measurements obtained from all valid samples submitted to the laboratory. The laboratory completeness objective will be a minimum of 90 percent. This allows for the potential loss of samples impossible to analyze due to unforeseen interferences and rejected data following data validation.

L2005-346 Rev. 1

CITY_21MC100_003243456

NYC-WTC_000441611

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441611Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

Compare copies and versions →