Ambient Air Monitoring Program Section No. 8 Quality Assurance Project Plan Revision No.: 0 130 1 iberly Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 50 of 116
modifications to achieve quantitation limits that are significantly below the project Action Limits. The laboratories selected will, at a minimum, meet the project quantitation limits included in Table 8-1.
Laboratories will need to adjust all quantitation limits based on dilutions, sample volumes, extract/digestate volumes, and cleanup procedures. In all cases, the adjusted quantitation limit (or sample quantitation limit) must be below the project Action Limit. In establishing the required quantitation limits for this program, these factors were considered in ensuring the project Action Limits would be achieved.
Sensitivity will be maximized by following the EPA and NIOSH methods, utilizing experienced/trained laboratory personnel, and conducting laboratory audits.
8.2.6 Completeness
Completeness is a measure of the amount of valid data obtained from a measurement system compared to the amount that was expected to be obtained under normal conditions. “Normal conditions” are defined as the conditions expected if the sampling plan was implemented as planned.
Field Completeness Objectives
Field completeness is a measure of the amount of (1) valid measurements obtained from all the measurements taken in the project and (2) valid samples collected. With the exception of the real-time measurements, the field completeness objective will be a minimum of 80 percent. This allows for the potential loss of samples due to sampling problems or media breakage during transport. The completeness objective for the real-time measurements (e.g., PMio, PM2.5, gaseous mercury) will be a minimum of 90 percent.
Laboratory Completeness Objectives
Laboratory completeness is a measure of the amount of valid measurements obtained from all valid samples submitted to the laboratory. The laboratory completeness objective will be a minimum of 90 percent. This allows for the potential loss of samples impossible to analyze due to unforeseen interferences and rejected data following data validation.
L2005-346 Rev. 1
CITY_21MC100_003243456
NYC-WTC_000441611
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
76 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
74 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421577
QA plan for ambient air monitoring for the 130 Liberty Street deconstruction project, Sept 2005.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similar indexed content