Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 130 1 iberly Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 32 of 116

Table 7-3. Phase II - Structural Deconstruction Phase Sampling and Analysis Summary Location Paranieter(s) Sample Frequency Analysis Method Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Ground/Street 1. Asbestos Each Day (asbestos and 1. TEM/SEM Level 2. Silica silica are sampled during 2. XRD (4 Locations) work shift) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodated Carbon Trap/CVAFS 8. PMio Continuously “Real-Time” 8. EBAM/Gravimetric 9. PM2.5 Each Day (PMio and PM2.5 9. EB AM/Gravimetric on 24 hour basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly) Roof Top and 1. Asbestos Each Day (asbestos and 1. TEM/SEM Scaffolding 2. Silica silica are sampled during 2. XRD (4 locations on roof work shift) top and 4 locations 3. Metals Each Day (24 hr. Basis) 3. ICP/MS on scaffolding) 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodated Carbon Trap/CVAFS 8. PMio Continuously “Real-Time” 8. EBAM/Gravimetric 9. PM2.5 Each Day (PMio and PM2.5 9. EBAM/Gravimetric on 24 hour basis at each location; PM^ and PM; -, reference sampler at 1 location per day on 24- hour basis with location changed monthly)

Phase II - Structural Deconstruction

During Phase IT of the deconstruction project, air monitoring will take place at all twelve (12) stations each day. During the first three (3) days only of Phase II, samples will be collected at all twelve (12) locations for semi-volatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this initial three (3) day period, samples for these organic parameters will be reduced to a single location per week frequency employing the twelve (12) station network. More specifically, samples will not be collected at all twelve (12) stations each day; rather a single set

L2005-346 Rev. 1

CITY_21MC100_003243438

NYC-WTC_000441593

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441593Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.